Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A One Step Process for Manganese Leaching-Desulfurisation of Flue Gas

    By A He, J Li, J Pan, J Clout

    The removal of sulfur from SO2 containing flue gas is improved by adsorbing SO2 into solution with manganese ions as catalyser, however, burnt lime slurry has to be added to modify solution pH and the

    Jan 1, 2004

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    Goldilocks – value of information for geoscience applied to coal in tactical time horizons

    By D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman

    Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th

    Mar 22, 2022

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    Reduction Kinetics and Mechanism of Pellets Prepared from High-chromium Vanadium-titanium Magnetite Concentrate

    By P N. Duan, Z G. Liu, M S. Chu, X X. Xue, B Liu, G J. Cheng, T Jiang, J X. Liu

    High-chromium vanadium-titanium magnetite has not been exploited and made full use of on a large scale so far due to the immature utilisation technology and the reality that the utilisation efficiency

    Jul 13, 2015

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    Application of sensor-based-sorting technology at pilot plants in South America

    By T Soares, P Esteves, C Senna, V Souto, E Dias

    Steinert provides a wide portfolio of Sensor Based Sorting (SBS) technologies, including the possibility to combine different sensor data in the development of the separation applications. This multi

    Nov 10, 2020

  • AUSIMM
    An Experiment to Validate Bubble Sizing Techniques Using Bi-Modal Populations of Known Proportions

    A novel approach to validate size distributions obtained from bubble sizing techniques is introduced. The experimental rationale consists in verifying whether the output features the anticipated bi-mo

    Jan 1, 2005

  • AUSIMM
    Tunnel Boring Under Stockholm City

    Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation f

    Jan 1, 1987

  • AUSIMM
    Direct Electrowinning of Lead from Lead Sulphide Concentrates

    By Siemon J. R

    It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M

    Jan 1, 1976

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Living with Change at South Bulli Colliery

    By Ogilvie M

    South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w

    Jan 1, 1991

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper Limited

    By Clark G

    The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea

    Jan 1, 1986

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021