Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Basic Aspects on Separation of Biological Flocs in Dissolved Air Flotation

    By M Ljunggren, M Lundh

    Dissolved air flotation (DAF) in wastewater treatment as a separation process of submillimetre biological flocs is based on the generation of bubble/floc aggregates. DAF is a complex process but has g

    Jan 1, 2005

  • AUSIMM
    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    Biooxidation of Two Arsenal Refractory Gold Concentrates and Gold Cyanidation

    By Rongqing Q, Tiancong Z, Yiyuan L

    The influence of pulp density, ferric ion concentration and particle size on the tank bioleaching of two kinds of refractory gold concentrates are discussed. The chemistry and mechanism of the biole

    Jan 1, 1992

  • AUSIMM
    How to Make (and Lose) Money in Minerals Exploration and Development in a Changing Environment

    Viking Holdings Ltd, a Todd Corporation company, is active in the mineral industry through operations, joint ventures and equity investments. Identification and management of risk is key to the succes

    Jan 1, 1997

  • AUSIMM
    Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc Plant

    By Nolan D. P, Balales M

    Over the last two years work has been undertaken within the Pasminco Metals - BHAS Zinc Plant to improve the efficiency and maintain the production capacity of the operation. The work has centred up

    Jan 1, 1993

  • AUSIMM
    The Auscoke Project

    The Auscoke project has reached-a stage where a pilot plant nominally able to produce 100 t.p.d. of coked briquettes is being brought on stream during Nov. 1971 . The targets for this stage of the

    Jan 1, 1972

  • AUSIMM
    Design of Very Large Mill Installations: Mill Design Specifications and Audits

    A standard practice of auditing mill designs has developed in the mining industry. The purported aim of this task is to ensure that the mill being offered conforms to the design specification, thus re

    Jan 1, 2002

  • AUSIMM
    The Application of Rubber and Polyurethane Screens for Sizing, Dewatering and Heavy Medium Recovery

    We are all no doubt aware that with today's high costs it is more important than ever to get the maximum possible return on capital invested in the mining industry. Screening is an important a

    Jan 1, 1984

  • AUSIMM
    Nickel-Ore Formation in Island-Arc Magmatism, Kamchatka

    By Grinenko VA

    Mineralogical, chemical, and isotopic data have been obtained for samples from 11 volcanoes and 4 kortlandite intrusives on Kamchatka.Similarities and differences in ore-bearing and barren intrusives

    Jan 1, 1990

  • AUSIMM
    Review of Rock Blasting and Explosives Engineering Research at SveBeFo

    A short overview of the research program of SveBeFo, Swedish Rock Engineering Research, which was founded in 1993 is first given. Then four recent and ongoing projects in rock blasting and explosive

    Jan 1, 1995

  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By J Chen

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled stopes has been the primary cause of bulkhead failures and emphasis is placed on res

    Jan 1, 1998

  • AUSIMM
    Recoverable Resource Estimation - A Comparison Using Constrained and Unconstrained Geology Models - Anwia Gold Deposit

    By D Clarke, R Simpson

    The Main lode in the Anwia Gold deposit is difficult to interpret due partly to the fact that three separate grid and drill hole orientations exist over the area and partly due to a lack of understand

    Jan 1, 2006

  • AUSIMM
    Ore Mineralogy of the Tolukuma Epithermal Gold Deposit, Papua New Guinea: Occurrence, Paragenesis and Controls on Formation

    By Leach T

    The Tolukuma Gold Deposit is hosted by metamorphic and volcanic rocks, and igneous intrusions. Dilatant structures for the main veining appear to be provided by post-metamorphic flexure/faulting; syn-

    Jan 1, 1993

  • AUSIMM
    Experience with Pre-Drainage of Seam Gas in the Western Area of the National Coal Board

    Methane predrainage from coal seams in the Western Area of the U.K. has been practiced over the past decade. The differing reasons for the practice include the controlling of gas emission rates in

    Jan 1, 1982

  • AUSIMM
    The Origin, Distribution And Geological Setting Of Copper And Nickel Sulphides In The Riwaka Complex, North West Nelson, New Zealand

    In North-West Nelson the Riwaka Complex, a linear basic intrusive complex, is exposed for approximately 45 kilometres. Some 500 kilometres south, across the Alpine Fault, a linear zone of similar b

    Jan 1, 1980

  • AUSIMM
    Desulphurizing ISF feed by roasting

    By Wright S

    The feed to the Cockle Creek Imperial Smelting Furnace consists of mixed Pb/Zn con- centrates and lead sulphate-containing elec- trolytic zinc plant residues. Roasting was investigated as a means of

    Jan 1, 1986

  • AUSIMM
    Pitfalls in the Preparation of Environmental Impact Reports

    New Zealand Steel Limited is nearing completion of the environmental reporting and planning procedures for its proposed fivefold expansion to steelmaking at Glenbrook, and supporting mining operations

    Jan 1, 1981

  • AUSIMM
    Application of a Truck Simulation Model at Mt. Whaleback Mine

    By Butters S. E, Deslandes J. V

    The selection of loading and haulage equipment in a proposed or oper- ating mine is vital in ensuring the cost effective achievement of produc- tion targets. To assist in the evaluation of different h

    Jan 1, 1989

  • AUSIMM
    Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong

    By I P. W Chau

    Construction of twin stacked railway tunnels through mixed ground conditions in the heavily populated urban environment of Hong Kong, including tunnelling in poor ground conditions, with low cover and

    Jan 1, 2008

  • AUSIMM
    Theory and Application of Thickener Design

    A new experimental procedure for determining the solids flux curve is detailed. The procedure is based on measuring the concentration at various heights of a bed of settled solids formed during a s

    Jan 1, 1989