    Mining Practice at Cleveland Tin N.L. Tasmania

    A mechanised sub-level overhead benching method is used at Cleveland, to produce 22,000 tons per month of ore assaying 0.92% Sn and 0.40% Cu. The ore occurs in a series of vertical lenses which can b

    Jan 1, 1970

  • AUSIMM
    Dewatering of Bentonitic Rich Coal Tailings Using Belt Press Filter

    By OÆBrien D. R

    Up until June 1988, Mount Thorley Coal Handling and Preparation Plant disposed of tailings by two methods. Approximately half of the plant tailings was mechanically dewatered by solid bowl centrifu

    Jan 1, 1989

  • AUSIMM
    Use of an on-line Moisture Meter to Investigate Product Moisture in Coal Preparation

    By Jensen B, Ofori P, He Y, White E, Stanmore B, Brien M, O&apos

    As part of a large AMIRA project, an on-line moisture meter was installed at two mine sites in Central Queensland. This project investigated the factors which control the moisture content of coarse (&

    Jan 1, 1995

  • AUSIMM
    Technical Challenges for the Pike River Coal Project in a Remote Mining Environment

    By J McNee

    Pike River Coal Limited (PRCL) is developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine is being developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2007

  • AUSIMM
    A Flotation Study for Effective Separation of the Heavy Mineral Sands

    By Takiuchi T, Kurita M, Owada S

    This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally

    Jan 1, 1993

  • AUSIMM
    Blast Vibrations in Soil and on Large Resonant Structures

    In order to satisfy environmental and mine operational requirements it is becoming increasingly important to minimise ground blast vibrations at certain locations. These locations are often in soil

    Jan 1, 1995

  • AUSIMM
    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Thermal Processing of Petroleum Fly Ash for Vanadium Recovery

    Sep 13, 2010

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    Mining Can Improve the Environment

    Mining is a necessary part of our modern lifestyle. However, mining can cause damage and pollution of the environment and therefore we must manage our resources wisely accounting for the physical,

    Jan 1, 1987

  • AUSIMM
    Cementation of Cadmium from Process Liquors

    By Pollard D. M

    The effects of pH, temperature and the form of zinc used on the kinetics of cementation of cadmium from process liquors were investigated. Batch tests were conducted in stirred beakers, and the cem

    Jan 1, 1989

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    Recent Developments and Investigations of D.M. Cyclone Coal Preparations at the BHP Port Kemble Washeries

    By Nightingale R, Johnson B, Bensley C, Vince A, Keast-Jones R

    In order to counter the massive increase in the level of near gravity material that would follow the reduction in dense-medium cyclone separation density at B.H.P. Slab and Plate Product Division&

    Jan 1, 1987

  • AUSIMM
    Operations of a Small Heap Leach

    The Fosterville goldfield, situated 25 km east of Bendigo, Victoria was at its peak between 1894-1910 with some 47 600 ounces produced (Figure 1). Since that time intermittent mining and tailings r

    Jan 1, 1994

  • AUSIMM
    Woodlawn Mine - An Underground Operation Review

    Woodlawn Mines began underground operations in 1986. At the time of going underground it was envisaged that there would be no 'contract' payment to the underground employees. This was a re

    Jan 1, 1995

  • AUSIMM
    The Nickel-Copper Deposit at Radio Hill, Karratha, Western Australia

    By Wightman D, Hoyle M. W H, Peters W. S

    The Radio Hill nickel-copper deposit is located 30 km south of Karratha. It is a new discovery in an area where similar mineralization had been previously discovered at Mt. Scholl and Ruth Well. Radio

    Jan 1, 1987

  • AUSIMM
    Supergene Mining at Elura

    Confirmation of significant mineable reserves of high grade silver ore at Elura Mine has led to the development of a high cost, high recovery mining system. At the contact of oxidised and sulphide

    Jan 1, 1988

  • AUSIMM
    Reply to Dinner Address

    I am honoured and very pleased to have been given the opportunity this evening to say a few words of thanks not only on behalf of all the guests but especially for the delegates and accompanying p

    Jan 1, 1986

  • AUSIMM
    Novel Agglomeration Technology

    A form of wet pelletization is described where the bridging of the individual particles is achieved by a second liquid phase that pref- erentially wets the suspended solid particles. The phenomenon

    Jan 1, 1974

  • AUSIMM
    Petrology, Geochemistry and Tectonic Implications of Magmatism in Northern Hunter Ridge-Kadavu Island Group (Fiji). (772d3817-ba1c-497f-a5a8-fb10457552d2)

    By Eggins SM, Crawford AJ, Maillet P

    The Fiji Islands are remnants of a once continuous Solomon-Vanuatu-Fiji-Tonga volcanic arc (the Vitiaz arc), located at the boundary between the Indian-Australian and Pacific plates. They record a hi

    Jan 1, 1995

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987