Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Operation of Backfill for Reliable High Solids Concentration DischargeBy A G McLean
This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p
Jan 1, 1998
-
Performance and Acceptance Testing of Mine Refrigeration PlantsThere is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati
Jan 1, 2005
-
The State of Sampling Practice in the South African Minerals IndustryThe state of sampling practice in South African minerals industry must be appreciated in the context of the changes that the country has recently lived through. These include the entrepreneurship and
Mar 1, 2010
-
Diversion decision making with an integrated approach to design for operations and mine closureBy M Rafty, A Markham, S Atkinson
Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete
Jul 25, 2018
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel CaveBy A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
Improved hydration management on Australian mine sites with the MX3 hydration testing systemBy T Kilpatrick
Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme
May 5, 2022
-
Queensland Mines Should Consider Climate Change Impacts for DecommissioningBy M C. Evans
"Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require
Jul 16, 2014
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals provinceBy L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
Conclusions from long-term cover system performance monitoring – a case studyBy R Barritt
Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was
Jul 25, 2018
-
Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landformBy G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan
Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha
Jul 25, 2018
-
Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west AustraliaBy A Grigg, L Hackett
Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging
Jul 16, 2014
-
Wireless System for Monitoring Cave-back PropagationBy S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi
The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I
May 9, 2016
-
Designing Flotation Circuits for High Fines RecoveryBy D C. Curry, M F. Young
Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir
Jan 1, 2005
-
Grade Trends at the Elura MineThe Elura Orebody consists of a number of parallel, vertically oriented pipe-like structures of pyrite-sphalerite-galena mineralization located at the core of a structural dome. Concentric zoning of t
Jan 1, 1990
-
Description of Lead RefineryThe building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is
Jan 1, 1918
-
Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western AustraliaBy C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott
Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta
Aug 18, 2014
-
Gold mineralisation on Woodlark Island, Papua New GuineaBy Shatwell DO, Hayward SB, Leach TM
Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila
Jan 1, 1994
-
Bubble Coalescence Behaviour in Dissolved Air Flotation Froths (Centenary of Flotation Symposium 2005)By S J. Neethling and, S J. R Simons
In this paper the effect of humic substances (natural surfactants), electrolytes and solid particles on bubble coalescence, and as a consequence on froth stability, have been investigated. In this stu
Jan 1, 2005
-
Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro KencanaBy H Utama, hi, A Suw
PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method
Nov 29, 2022
-
Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South AfricaBy J M. Nel
Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R
Oct 5, 2011