Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Selective Open Pit Mining and Ore Treatment at Croydon Gold Mine, North Queensland

    By Kandemir H, Stafford G

    The Croydon Gold Mine is located in northwest Queensland and is a joint venture between Central Coast Exploration N.L. and Pancontinental Mining Ltd. The mining operation commenced in 1987 and co

    Jan 1, 1989

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    The Copper-Lead-Sulphur System at High Temperatures, and its Application to Continuous Copper Drossing

    By Willis GM

    The matte-metal-equilibria in the system Pb-Cu-S have been studied at temperatures between 720 and 920¦C by direct sampling and D.T.A. methods. These results are compared with those of other worker

    Jan 1, 1975

  • AUSIMM
    Production of Submicron Particles by Autogenous Grinding with a Stirred Mill

    By Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M

    The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par

    Jan 1, 1993

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Hydraulic Boulder Fragmentation Using Small Explosive Charges

    By P Worsey, B Lane

    The recommended maximum explosive weight for boulder blasting using internal charges is 0.15 kg/m 3 (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, creating increas

    Jan 1, 1999

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head Grade

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled

    Jan 1, 2009

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Coal Seam Degasification by use of Hydraulic Fracturing in Vertical Wells Case Histories

    By Barro L

    Very large reserves of gas are contained in coal. Because of the low permeability of the coal gas flow rates are very low. Fracturing of the coal can be achieved by use of the nitrogen - foam frac

    Jan 1, 1982

  • AUSIMM
    Ground Control Hazard Analysis in Multi-Seam Mining

    By Zhou Y, Karmis M, Haycocks C

    Hazard analysis utilizes interaction mecha- nisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using charac

    Jan 1, 1992

  • AUSIMM
    Description of Transportable Bulk Testing Plants for use in Diamond Exploration

    Diamond bearing deposits are extremely low grade and require large bulk samples to be tested to determine the grade and quality of the stones. The semi portable plants, for treatment of these bulk

    Jan 1, 1984

  • AUSIMM
    Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken Hill

    By Johns AS

    Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.

    Jan 1, 1978

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Planning and Cost Criteria for Mining Infrastructure

    By Mahony BK

    This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans

    Jan 1, 1983

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011