Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Gippsland Basin South Platform: Unprospective or Underexplored?I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r
Jan 1, 1992
-
Shifting the comminution workload from the primary ball mill to TowerMill circuitBy H Ishikawa, R Halomoan, S Palaniandy
The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,
Aug 29, 2018
-
Acceleration of the oxidation reaction of iron-bearing materials by using biomass char in the sintering bedBy E Kasai, D Maruoka, Y Konno, T Murakami
The iron ore sintering process produces approximately three per cent of carbon dioxide emission in Japan because a large amount of coke breeze is used as the main agglomeration agent. Therefore, its s
Nov 8, 2021
-
Methods and Approach to Exploration for Hard Rock and Alluvial Gold in IndonesiaBy Dods G. H, Hewitt W. V
Ashton Mining Limited is currently one of the active companies undertaking gold exploration in Indonesia. Presently 7 Contract of Work areas are being explored for hard rock and alluvial gold. Hard
Jan 1, 1991
-
The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist InstallationThe hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista
Jan 1, 2005
-
The Monitoring of Medium Rheology in Dense Medium Cyclone PlantsBy Reeves T. J, Hansen J. Y
Dense medium cyclone theory, supported by extensive experimental and plant-scale evidence, demonstrates that medium rheology (stability and viscosity) substantially affects cyclone performance in mine
Jan 1, 1989
-
Characterisation of SFCA phases in iron ore sinter by combined optical microscopy and electron probe microanalysis (EPMA)By M I. Pownceby, S Hapugoda, H Han, E Donskoi, L Lu
Iron ore sinter mineralogy and its associated macro-/micro – structure has a strong impact on sinter quality. At a macroscopic scale, sinter ideally consists of a strong, porous matrix which bonds rel
Nov 8, 2021
-
Potential for Future Developments Outside of Existing Fields in the Gippsland BasinBy MacLean L
In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate
Jan 1, 1982
-
Foreword (7965683f-3b26-4771-bc18-123c6df66373)In late 1984, Council of the Australasian Institute of Mining and Metallurgy accepted a proposal to establish a Mineral Heritage Committee. This was to be involved in matters relating to mineral he
Jan 1, 1987
-
The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South LimitedIn this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan
Jan 1, 1935
-
The Pre-Undercut Caving Method at the El Teniente Mine, Codelco ChileBy A Bonani, R Molina, H Constanzo
With conventional undercutting sequence the infrastructure on the production level often has a short serviceable life before major rehabilitation is necessary and is characterised by high maintenance
Jan 1, 2000
-
Wall Control BlastingBy D P. Blair
There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential
Aug 24, 2015
-
Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces MineBy R M. Arellano, D M. W Harney, M Makhuvha
Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous
Aug 18, 2014
-
Coal - Paper No. 6 A Petrographic Basis For Classifying Australian CoalsBy Taylor G. H
The proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopical techniques. The scheme has be
Jan 1, 1969
-
Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic SeparatorsBy A Horn
Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g
Jul 11, 2011
-
Geochemical Detection of Mineralisation Buried by Deep CoverBy A Mokhtari, S Gatehouse, N Rutherford
Geochemical exploration continues to play a significant role in new mineral discoveries inAustralia and elsewhere, including terrains where mineralisation is buried or otherwise obscured by regolith c
Jan 1, 2008
-
Paper No. 197. Notes on Tin Sluicing in Tasmania.IN this paper an attempt is made to describe the sluicing operations on the tin fields of north-eastern Tasmania. No claim is made to completeness, for much of the ground has already been covered, and
Jan 1, 1911
-
HIT – a Portable Field Device for Rapid Testing at SiteBy T Kojovic
"The index A*b, determined from the Julius Kruttschnitt Mineral Research Centre (JKMRC) drop weight tester (DWT) results, has become well-known in the mining industry as a reliable measure of ore hard
Oct 10, 2016
-
Geology, Mineralisation, Alteration, and Zoning of the Cu-Fb-Zn-Ag Lodes at Quiruvilca, PeruThe Quiruvilca district, located 80 km east of Trujillo in north central Peru (Fig. 1), has produced over eight million tons of Cu-Pb- Zn-Ag ore from approximately 60 veins since 1789. "Quiruvilca
Jan 1, 1987
-
Long-Term Water Management - The Forgotten Legacy of Mine ClosureBy G Byrne
Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i
Nov 26, 2013