Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tackling the Gorillas - Hairy Scary Complacency to Safety in Mining or a Banana Packer's Story

    Shane is enjoying his new work. Six months ago, he was stocking shelves at his local supermarket and decided to make the big move to a job in mining with more challenge and, of course, more dollars. H

    Jun 1, 2010

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Pre-concentration by screening – a cost-effective approach to testing and evaluation

    By N Clarke, A Barros

    Preconcentration of run-of-mine subgrade and marginal ore by screening has the potential to substantially improve the economics of mining, particularly for large, low-grade orebodies, and to reduce en

    Aug 24, 2022

  • AUSIMM
    Underground Aquifer Dewatering and Water handling Within the Stratiform Zn-Pb-Ag Orebody at the Hilton Mine, Mount Isa, NW Queensland

    Three separate and unconfined aquifers occur in the Hilton area, named relative to position in relation to ore horizons: Footwall Aquifer in the east; Ore-Zone Aquifer within the ore-bearing Urquhart

    Jan 1, 1993

  • AUSIMM
    Physical Aspects of Fine Particle Flotation

    In the flotation of fine particles, problems arise which do not occur with coarse-ground pulps. For example, the presence of colloidal or near-colloid- al gangue particles gives rise to ex- cessive

    Jan 1, 1984

  • AUSIMM
    A new gas emission prediction model based on Australian longwall mining conditions

    By Q Qu

    Reliable prediction of longwall gas emission sources and rate plays a critical role in mine ventilation and methane drainage capacity planning. Over the years, Australian longwall mines have been usin

    Oct 12, 2022

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    Contemporary Criteria of Open Pit Long-Term Production Scheduling

    Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo

    Sep 26, 2011

  • AUSIMM
    Evaluation of Precision being Obtained by a Three-Stage Sampling System for Coal

    By C D. Rose

    "The primary objective of this paper is to demonstrate a different approach to predicting and verifying mechanical sampling system precision. Early in the year 2011 an experiment was conducted to eval

    Aug 21, 2012

  • AUSIMM
    Recognising False Anomalies in Drillhole EM

    By Morland R

    In the course of an exploration program aimed at increasing Pasminco Mining's ore reserves, an electromagnetic survey down one of the underground drillholes at the North Mine, Broken Hill, record

    Jan 1, 1994

  • AUSIMM
    Rockfall Hazard Mitigation Best Practice

    By A Teen

    An open cast mine on the West Coast of the South Island of New Zealand proposes to remove up to 30 m of overburden to access an ore body neighbouring National Reserve land. Part of the conditions of t

    Jan 1, 2007

  • AUSIMM
    Narrow Vein Education - Back to the Future?

    By S Hall

    Mining schools around the world, many unfortunately now closed, were often established to teach the techniques of narrow vein mining and associated processing to students studying part-time while work

    Mar 26, 2012

  • AUSIMM
    Application of Tagging Systems for Personnel and Vehicle Access Control

    By S Barrow, D Kent

    Controlling the access of equipment, and people, has become more critical over the last few years for improving productivity and to meet safety responsibilities imposed by legislated obligations to ha

    Jan 1, 2005

  • AUSIMM
    The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSW

    In August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha

    Jan 1, 1983

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • AUSIMM
    Beyond the manufacturing mindset – adapting workforce skills for the tech driven mining industry

    By Y Lanwin

    The Australian mining sector is undergoing a significant transformation with the adoption of advanced technology to the operational landscape. This has highlighted a critical disconnect between our tr

    Sep 1, 2024

  • AUSIMM
    Selection of undrained shear strength parameters of residual soils and their application in stability analysis

    By Y Xu, T Rowles, B Dareeju, A Dissanayake

    Recent updates on tailings dam design guidelines require analysis of undrained (short-term) stability with the application of the SHANSEP model. The SHANSEP model, which was originally developed for a

    Jul 1, 2021

  • AUSIMM
    Evaluation of CAVEX Hydrocyclone in the Ok Tedi Grinding Circuit

    Ok Tedi Mining Limited has recently completed the first phase of a trial to compare the performance of D26B Krebs cyclones in different configurations to the new Warman 650 mm CAVEX cyclones. From 199

    Jan 1, 2000

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    The Role of Flotation Frothers in the Particle-Bubble Attachment Process

    By He BQ

    Static attachment of bubbles to solids is contrasted with dynamic attachment in flotation cells. The times of contact during particle-bubble collisions in dynamic attachment are compared with the

    Jan 1, 1984