Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
DOHEMS®?technology to improve risk assessments and early detection - SynopsisBy C. J. Badenhorst
The scope of this project was to research, develop and eventually produce a personal occupational hygiene and safety exposure monitor system to assist in recording and analysing various stress factors
Jan 1, 2010
-
Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)By T. M. Tharp
Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati
Jan 1, 1984
-
Electrical and Radiometric Logging of Mining Exploration Drill Holes in the Woodcutters Area, Rum Jungle District, N.T.Except for uranium search, conventional oil well logging techniques are relatively little-used in mining exploration. The main reasons for this are cost and an apparent lack of awareness of the potent
Jan 1, 1978
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Mining - Basic Considerations for Long-Distance Solids Pipelines in the Mineral Industries (MINING ENGINEERING. 1961, vol. 13. No. 8. p. 976)By R. Costantini
The author discusses the promising future of the use of pipelines for transportation of ore slurries over long distances, citing existing installations. Various criteria and factors affecting the use
Jan 1, 1961
-
Cable Shovel Simulation leading to A Novel Dipper DesignBy Ning Shi
This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No
May 1, 2004
-
Mining induced stress estimation for pillar extraction at shallow coverBy A. K. Singh, R. Singh, P. K. Mandal
On the basis of in situ study of pillar loading at different sites, an attempt is made in this paper to visualize the development of mining induced stress under varying geo-mining conditions. Field st
Jan 1, 2003
-
Analysis Of Entry Roof Failure And Falls At Springvale CollieryBy Wm. Mark Hart
High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems
Jan 1, 1996
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
The Implementation of Floatstar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits (95bc70ac-0a71-42d0-95cb-764715f2cd9c)By P Moswate, D Phillpotts, S M. Mantsho, P Strobos
A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical
Jul 15, 2013
-
The Discovery of the Nam San Copper-gold Deposit, Phu Kham, LaosBy K J. F Logan, P W. Leaman, B A. Tucker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Nam San copper-gold deposit was discovered in 2011 and is a likely blind extension of t
Mar 18, 2015
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
The Soilex Pile SystemBy Erik M. Westerberg
The Soilex Pile combines a slender shaft, for quick and easy installation, with an enlarged pile toe, for high capacity. The key component is the Expander Body, which is inflated by injecting cement g
Jan 1, 2000
-
The North American Tunnel Method—Lessons LearnedBy Don Phelps, John Hawley, David P. Field
In recent years observational techniques of tunneling have become increasingly popular methods to facilitate complex underground infrastructure projects. The traditional design and construction manage
Jan 1, 2005
-
Final Report Of Investigation To The Diesel Emissions Evaluation Program (Deep) - Noranda Inc. - Brunswick Mine - Diesel Particulate Filter (DPF) Field Study ? Executive Summary ? About the ProjectBy S. McGinn
The Brunswick Mine Diesel Particulate Filter Study was one of several research projects initiated by the Diesel Emissions Evaluation Program (DEEP). The study was carried out at Noranda?s Brunswick Mi
Jan 1, 2004
-
A Review of Tecnology Developments in Nickel Pyrometalurgy and Nickel Production Trends over the Last Three DecadesBy A. E. M. Warner, P. J. Mackey
"In 1988, two of the present authors Warner and Vahed [1] were amongst several co-authors on a seminal paper reviewing nickel pyrometallurgical operations of the era. Given that significant changes in
Jan 1, 2015
-
Institute of Metals Division - Primary Recrystallization Textures in Cold Rolled Si-Fe CrystalsBy C. G. Dunn, P. K. Koh
The primary recrystallization textures of 11 single crystals cold rolled 70 pct were determined. The effect of crystal orientation on recrystallization behavior was investigated also and found to be l
Jan 1, 1957
-
Evaluating Ventilation Parameters For Extended-Cut Mining – Preprint 97-148By J. P. Rider
The number of extended cut mining systems has increased significantly in coal mines over the last decade, and there is a constant push to extend the face ventilation systems to even greater setback di
Feb 24, 1997
-
Taxation Neutrality in MiningThe Government signalled its intention in the Economic Statement on 17 December 1987 to improve the fairness of the taxation system and to facilitate the process of economic adjustment by: removing t
Jan 1, 1988