Search Documents

  • AUSIMM
    The Chemical Treatment of Gold Slime for the Recovery of High Purity Gold and Silver

    The ready solubility of gold in dilute aqueous solutions of the cyanides of the alkalies or alkaline earths provides a convenient method for the separation of the precious metal -from the large surplu

    Jan 1, 1956

  • NIOSH
    RI 3328 Progress Reports - Metallurgical Division - 16. Ore-Testing Studies ? Introduction And Summary

    By C. W. Davis

    During the fiscal year 1935-36, the Ore-Testing Section has been active in carrying out a program designed to attain the objectives that have been set up for it. For the Purpose of standardizing im

    Jan 1, 1937

  • NIOSH
    RI 3328 Progress Reports - Metallurgical Division - 16. Ore-Testing Studies - Introduction And Summary (85a16109-951b-4d83-9f54-65ae42667c54)

    By C. W. Davis

    During the fiscal year 1935-36, the Ore-Testing Section has been active in carrying out a program designed to attain the objectives that have been set up for it. For the purpose of standardizing im

    Jan 1, 1937

  • NIOSH
    OFR-169-82 Guideline Manual For Front-End Loader Load -And-Carry Applications

    By James W. Martin

    This user's manual analyzes the application, selection and performance of front-end loaders in mining operations which can effectively utilize their load-and-carry capability. All aspects of the

    Jan 1, 1981

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • TMS
    Sulfur And Oxygen Partial Pressure Ratios Prediction In Copper Flash Smelting Plants Using Reddy-Blander Model (179070f4-60ac-4b6d-ac5a-2f581fe26c75)

    By Bora Derin

    The partial pressure ratios of sulfur and oxygen for several copper flash smelting plants were derived using the Reddy-Blander (RB) model and predicted dissolved sulfur contents available in the liter

    Jan 1, 2003

  • TMS
    Sulfur And Oxygen Partial Pressure Ratios Prediction In Copper Flash Smelting Plants Using Reddy-Blander Model

    By Bora Derin

    The partial pressure ratios of sulfur and oxygen for several copper flash smelting plants were derived using the Reddy-Blander (RB) model and predicted dissolved sulfur contents available in the liter

    Jan 1, 2003

  • CIM
    Froth Flotation: The Kinetic Approach

    By R. R. Klimpel

    "SYNOPSISA discussion of the importance of flotation rate in the analysis of mineral flotation is presented. In particular, the highly interactive nature of the flotation ""system"" is emphasized wher

    Jan 1, 1984

  • NIOSH
    IC 7406 Diesel Equipment in Underground Mining

    By J. H. East, D. Harrington

    "INTRODUCTION Considerable interest has been shown in the prospective use of Diesel-powered haulage equipment in both coal and non-coal mines. Foreign technical magazines have devoted considerable spa

    Apr 1, 1947

  • NIOSH
    OFR-32(2)-83 Safety Analysis Of The Blind Shaft Borer - Volume 2. Supplementary Reports A-E

    By C. A. Geffen-Fowler

    This report, sponsored by the Bureau of Mines, presents the results of an examination of the safety of the Blind Shaft Borer (BSB) shaft sinking system and an alternative modified BSB design concept i

    Jan 1, 1981

  • SME
    Importance Of Geotechnical Field Mapping In Assessing The Stability Of Underground Excavations

    By A. Adu-Acheampong

    Stope instability at Ashanti Goldfields Company Ltd. (AGC) is a major concern. Using information from field mapping, major discontinuity sets were defined, Rock Quality Designation (RQD) was determine

    Jan 1, 2003

  • NIOSH
    OFR-130(2)-85 High Reliability Miner Hydraulic System - Volume I - Part II - Section III - G Valves - Introduction

    Operator efficiency and control capability along with cost effectiveness have been the quest of mining, industrial, and mobile hydraulic engineers for years. The majority of the functions in present d

    Jan 1, 1983

  • SME
    A Review Of The Technology Of Glass Recovery From MSW ? Introduction

    By Hugh R. Rhys

    The question of the desirability of recovering cullet from MSW in order to recycle it into the manufacturing of glass containers remains a controversial one. The main factors appear to be: 1. The pos

    Jan 1, 1975

  • SME
    Sales Comparison Valuation Of Development And Operating Stage Mineral Properties (35d10c9f-1d98-4437-8650-1c6154123f45)

    By T. R. Ellis

    Minerals Appraisers/Valuers often find great difficulty or failure in attempting to employ the Sales Comparison Approach to the Market Value Appraisal of development and operating stage mineral proper

    Jan 1, 2011

  • NIOSH
    The Mineral Industry Of The Islands Of The Caribbean - Bahamas

    By Nicholas G. Theofilos

    The Bahamian economy weathered the worldwide recession of the last few years better than most developing countries. This was mainly owing to the ties between the tourist industry of the Bahamas and th

    Jan 1, 1980

  • CIM
    OsEIP: The Oil Sands – Equipment Interactions Program

    By T. G. Joseph

    "The Oil sands-Equipment Interactions Program (OsEIP) is a collaborative research venture between Syncrude Canada Ltd., James Progithin International Ltd. (JPi), the University of Alberta, P&H MinePro

    Jan 1, 2002

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada

    By S F. Simmons, J Fleming

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophyi

    Jan 1, 1995

  • SME
    Los Angeles Tunnels Are Expanded With Help Of TBM Monitoring System

    During the last 20 years, more than 80 km (50 miles) of tunnels have been constructed in the Los Angeles, CA area. Recent projects include The East Central Interceptor Sewer (ECIS), completed in 2004

    Jan 1, 2008

  • NIOSH
    A Missing Component In Your Emergency Management Plans: The Critical Incident Stress Factor

    By Kathleen M. Kowalski

    In emergency management, the effects of stress on the performance of emergency personnel, typically have been ignored or regarded as too enigmatic to quantify. This paper discusses the concept of Crit

  • AIME
    Geology - The Need of a New Philosophy of Prospecting, 1960 Jackling Lecture (Mining Engineering Jun 1960, pg 570)

    By L. B. Slichter

    Prospecting is certainly the world's biggest and best gambling business. It is a game where the chips cost many thousands and where many millions, even billions, can be won. An attractive feature

    Jan 1, 1961