Search Documents

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • NIOSH
    IC 8104 Mining, Milling, And Smelting Methods, San Manuel Copper Corp., Pinal County, Ariz. ? Summary And Introduction

    By V. B. Dale

    San Manuel has been a modern prodigy from its inception to its present status as a block-caving operation producing 33,000 tons per day. The deposit was discovered, prospected, and developed with mode

    Jan 1, 1962

  • CIM
    Lead Flotation from Rod and Ball Mill Discharge at Nanisivik Mines Limited

    By J. Goyman, K. R. Rawling

    "1.1 Location and Transportation ServicesNanisivik Mines Ltd. is located at latitude 73°, 3,200 km north of Montreal and 700 km north of the Arctic circle, on the south side of Strathcona Sound, which

    Jan 1, 1984

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • AUSIMM
    Mapping of Structural Discontinuities in the Otago Schist as Potential Exploration Targets: Preliminary Results

    By D Craw, I M. Turnbull, R J. Norris, N Mortimer

    The Otago Schist is being subdivided on a regional scale into structurally, metamorphically and lithologically distinct blocks. Differences between blocks are subtle, and difficult to map in the field

    Jan 1, 1999

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • CIM
    Using Millmapper ™ to Reduce Milling Costs and Improve Performance

    By Tom Gabardi, Peter Clarke

    "MillMapperTM is a new 3D laser scanning technology that has only recently been introduced into the North American mining industry. It enables mill operators to gain a much more complete understanding

    Jan 1, 2012

  • CIM
    Changes in Physical Properties of Natural Gas Mixtures Through Conditioning •For Pipeline Specifications

    By G. A. Van Wielingen

    "The conditioning of natural gas to meet contract pipeline specifications involves in the majority of cases in Western Canada, the appropriation of substantial capital expenditures for treating and pr

    Jan 1, 1960

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders (122b6f71-61a6-4f23-afba-c5878df1df8c)

    By Jackson R. Pressley, Bruce Vandenberg

    The knowledge of how and when your explosives go off can help you make intelligent decisions regarding future application of explosives thus removing some of the black magic associated with blasting.

    Jan 1, 1992

  • CIM
    Towards Petrophysical Characterization of Comminution Behavior

    By Peter Fullagar, Adel Vatandoost, Steve Walters, Toni Kojovic

    "Traditional comminution tests are a vital component in every mine plant design. Comminution behavior governs both the cost of equipment and its operating efficiency. Most comminution tests are conduc

    Jan 1, 2009

  • AUSIMM
    A batch elutriation technique for the density-based fractionation of iron ore

    By D M. Hunter, S M. Iveson, K P. Galvin

    For low density materials such as coal, density-based fractionation of particles via the sink-float method is relatively simple due to the availability of liquids of suitable density; however, for hig

    Jul 24, 2017

  • SME
    Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract

    By David Hake, David Salisbury

    The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT

    Jan 1, 2005

  • DFI
    The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? Synopsis

    By J. M. Pei

    In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se

    Jan 1, 2010

  • SAIMM
    Thermogravimetric Investigation of Macadamia Nut Shell, Coal, and Anthracite in Different Combustion Atmospheres

    By M. J. Makhula, R. M. S. Falcon, S. O. Bada, L. M. Falcon

    "SynopsisThe combustion and co-combustion behaviour of macadamia nut shell, high-ash coal, and anthracite, along with their blends was studied using thermogravimetry. The reactivities of all samples w

    Jan 1, 2015

  • NIOSH
    OFR-49-75 Seismic Mine Monitor System - Phase IV Report

    By J. C. Fowler

    The field testing of the Seismic Mine Monitor System is described. This system consists of nine geophones buried about 40 feet deep over a ten-square-mile area, the amplifiers and electronics needed t

    Jan 1, 1974

  • ISEE
    "Journal: Evaluating and Managing Blasting Risk Part II"

    By Gordon Revey

    The challenge of managing blasting risk, types of risk, public perception, and a system for managing risk were covered in the first part of this article in the May/June 2000 issue of the Journal of Ex

    Jan 1, 2001

  • SME
    A Computer Design Of Ultimate Pit Limit By Using Transportation Algorithm

    By Panlop Huttagosol

    The use of computer models to design ultimate pit limit of an open pit mine during its feasibility study has become an emphasized procedure in mining. It is a normal practice in open pit mine design t

    Jan 1, 1992

  • SME
    Water Jet Assisted Boring In South African Quartzites

    By J. L. Page, A. C. Marlowe

    The Research and Development Services of South Africa has begun underground trials with a Robbins 52RE blindhole borer using a cutterhead fitted with high pressure water jets to assist mechanical cutt

    Jan 1, 1985