Search Documents

  • AUSIMM
    Computer-Assisted Geological Mapping

    Measurements from an old survey are being machine processed as a pilot project in the development of a computer-assisted method of structural mapping in shield areas. The key element in the system is

    Jan 1, 1969

  • ABM
    AVALIAÇÃO DA HOMOGENEIZAÇÃO DE LIGA Ti35Nb PROCESSADA POR METALURGIA DO PÓ E EXTRUSÃO ANGULAR EM CANAL

    By Juan Garcia de Blas

    O presente trabalho aborda o desenvolvimento de liga titânio-nióbio obtida por metalurgia do pó no qual foi introduzida uma operação de extrusão angular em canal (Equal Channel Angular Pressing - ECAP

    Aug 17, 2017

  • NIOSH
    IC 7688 Black Hills Mineral Atlas, South Dakota: Part 1 (In Two Parts) ? Introduction

    The Black Hills Mineral Atlas briefly summarizes all pertinent date available on the mines and mineral deposits in the Black Hills that have been explored, developed, mined, or located. The purpose

    Jan 1, 1954

  • SME
    Synthetic aperture sonar as a tool for rapid high resolution deposit estimation

    By Rolf Birger Pedersen, Alden Ross Denny

    "Synthetic Aperature Sonar (SAS) is a powerful tool for ultra-high resolution marine survey. The Kongsberg HiSAS system deployed on the HUGIN AUV has a rangeindependent resolution of 3x3 cm for sonar

    Sep 1, 2014

  • SME
    Condemnation valuation : The taking of mineral bearing lands

    By M. C. Azar, W. B. Mason, G. L. Anderson

    Eminent domain overview Eminent domain is the power of the Government or a municipality to take property for public use without the consent or acceptance of the owner. Typically, the agency taking

    Jan 1, 1989

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives Mining, Metallurgy and Exploration (90281dd3-2aab-47ab-9150-b1897bd40ef5)

    By M. A. Reyes, L. Yan

    Heat and humidity buildup withn refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs in

  • SME
    Innovations in Underground Communication Infrastructures

    By Darrell Gillis

    Recent accidents in the United States underground Coal Mines and the on-going carnage in Underground Chinese Coal Mines has shown the danger associated with the lack of communication infrastructures i

    Jan 1, 2007

  • SAIMM
    Engineers For The 21st Century - Minerals And Metals Industry

    By P. J. Knottenbelt

    Outcomes from a workshop organized through the SAIMM revealed that the minerals and metals industry must develop its ?Engineering Team? if it is to continue to meet the challenges of globalization. Th

    Jan 1, 2002

  • AUSIMM
    Industrial Minerals Outlook in Australia

    Interest in industrial minerals in recent years has increased to such an extent that it has taken them into the mainstream of the Australian mineral industry. Notwithstanding that time series data o

    Jan 1, 1989

  • SME
    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • NIOSH
    IC 8041 Peat Producers In The United States In 1960 ? Introduction

    By Eugene T. Sheridan

    The Bureau of Mines annually canvasses the peat producers in the United states and publishes economic data on the peat industry, based upon reports submitted by producers. This publication lists all p

    Jan 1, 1961

  • AUSIMM
    The Nature and Utilization of Iron Blast Furnace Slags

    The term slag has been used to define a wide variety of material including mine spoil and slag produced at steel plants. The present paper is concerned only with the non-metallic alumino-silicates dev

    Jan 1, 1964

  • SAIMM
    The Evaluation Of The AAC Pump-Cell Circuits At Anglogold?s West Wits Operations

    By J. Rogans

    This paper discusses the comparative performances of the three activated carbon adsorption circuits at the West Wits operations of Anglogold. These circuits consist of two pump-cell circuits (at Two P

    Jan 1, 2002

  • AUSIMM
    Effect of Additives on Anionic Flotation of Magnesite

    By Narasimhan K. S, Sastri S. R

    A typical high silica low grade magnesite from the Salem area of Southern India, was used in studies to develop a suitable flotation system involving commercially inexpensive sodium oleate as the coll

    Jan 1, 1980

  • SME
    Rare Earths Not Rare Anymore

    By F. G. Heivilin

    We are no longer short of viable Rare Earth deposits. As little as 2 years ago China mined and produced 97% ofthe world?s rare earths. Only a few deposits were in an advanced stage of exploration and

    Feb 27, 2013

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924