Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines

    By V. Eu. Anufriev

    Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re

    Jan 1, 1996

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Identification Of Factors Affecting Horizontal Displacement In Subsidence Process

    By Yi Luo

    In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas

    Jan 1, 1996

  • SME-ICGCM
    Two Case Studies Of The Performance Of Rib Supports

    By M. K. Larson

    The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing

    Jan 1, 1996

  • SME-ICGCM
    Design And Hazard Assessment Of Mine Ore Passes

    By M. J. Beus

    This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro

    Jan 1, 1996

  • SME-ICGCM
    Applications Of Probabilistic Analysis In Mine Ground Control

    By Gang Chen

    Conventional methods designate a factor of safety, a deterministic number, to indicate the stability of a mine excavation. However, this deterministic description of excavation stability is frequently

    Jan 1, 1996

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Laboratory Pull Tests Of Resin-Grouted Cable Bolts

    By Lewis Martin

    Spokane Research Center personnel are currently conducting research on cable bolts to assess their material and support properties, to provide design criteria for roof control systems under various ty

    Jan 1, 1996

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME-ICGCM
    Displacement Discontinuity Method For Three-Dimensional Stress Analysis Of Tabular Excavations In Non-Homogeneous Rock (ff6cd480-c238-4f06-bf11-52c054cbd2e8)

    By Leigh J. Wardle

    This paper describes a numerical method for calculating the three¬-dimensional stresses and displacements induced by tabular excavations in a rock mass consisting of parallel layers of distinct mater

    Jan 1, 1984

  • SME-ICGCM
    Using Ground Penetrating Radar For Roof Hazard Detection In Underground Mines

    By G. M. Molinda

    Ground Penetrating Radar (GPR) is being investigated for the potential to determine roof hazards in underground mines. GPR surveys were conducted at four field sites with accompanying ground truth in

    Jan 1, 1996

  • SME-ICGCM
    Rock Mechanics And Ground Control For Underground Mining And Construction

    Recent improvements are described in several techniques for ground control in underground mining. Promising methods for analysis and mitigation of rockbursts are discussed. Methods of assessing damage

    Jan 1, 1989

  • SME-ICGCM
    Correlation Between Unconfined Compressive And Point Load Strengths For Appalachian Rocks

    By Luis E. Vallejo

    The strength measured by the uniaxial compression test is a parameter that is widely used for the engineering classification of rocks. Sedimentary rocks such as shales, however, are difficult to evalu

    Jan 1, 1989

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009