Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Treatment Of Refractory Gold Ores Containing Carbonaceous Material And SulfidesBy W. J. Guay
Carbonaceous gold ores containing gold dispersed in sulfides are refractory to cyanidation because: (1 ) the carbonaceous materials adsorb gold during cyanidation; (2) a portion of the gold s so finel
Jan 1, 1981
-
Development of a tool for assessing the environmental sustainability of mining facilitiesBy G. Gaidajis, K. Angelakoglou
The development of a tool for assessing the environmental sustainability of mining facilities is described in this study. The tool is based on the analysis of basic components of the examined system,
Jan 1, 2011
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Semi-Autogenous Grinding (SAG) Mill Liner Design And DevelopmentBy D. Royston
SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic
Jan 1, 2007
-
Mine Development With Heavy RoadheadersBy Robert A. Pond
Heavy (exceeding 35 tons) roadheaders have not seen much use in the United States, but are used extensively in Europe to excavate many types of underground openings in civil and mining applications. E
Jan 1, 1983
-
New Test Methodology For Estimating The Abrasiveness Of Soils For TBM TunnelingBy F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen
Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes
Jan 1, 2007
-
Technical Note - Southern Illinois white tripoli as filler, extender, and abrasiveBy D. M. Avant, A. J. Solomon, S. M. Pickering, W. R. Fox
Introduction Most high purity silica is produced from crystalline quartz, generally from sand. However, there is a small area of southern Illinois where a porous, friable white chert rock is found
Jan 12, 1986
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
New Expectations of the Mining IndustryBy Andrew Howard
As the mining industry moves further into developing countries in search of new resources, its role in international development is coming under increasing scrutiny. This is a trend that is likely to
Jan 1, 2006
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SDBy V. L. Franzen, Z. J. Hladysz, C. A. Kliche
The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin
Jan 1, 2000
-
APCOM 23 – Computer Simulation, Automation, Optimization and Debate For the Minerals IndustryBy Kerry Spickelmier
Editor's note: information for this feature was taken from the published APCOM proceedings. Computer trends, with special focus on the reasons for computer use, grabbed the lion's share o
Jan 1, 1992
-
Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000By Andy Mille
The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d
Jan 1, 2001
-
The Effect Of Bit Geometry And Size On Cutting Parameters In Linear CuttingBy A. W. Khair
This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes
Jan 1, 2001
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
Investigation and Abatement of Subsidence Damage at the Heltsley Residence, IndianaBy Robert A. Cummings, Madan M. Singh
In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and
Jan 1, 1986
-
Biosolubilization of Phosphate OreBy Janine Acasi, Robert D. Rogers, Jonathan K. Trautman, Richard C. Cronn, James H. Wolfram
The demand for phosphate will continue into the future, because phosphate is currently irreplaceable as a plant nutrient and in many chemical applications. Phosphate is not recycled, so the supply mus
Jan 1, 1989
-
Class I Areas Impacts Analyses For A Proposed Expansion Of A Taconite Processing Facility In Northeast MinnesotaBy D. M. Wagner, G. Biggs, M. Osmundson, C. J. Twaroski
Potential air emission impacts to federal Class I areas from distant sources are receiving increasing scrutiny by federal land managers (FLMs). This paper provides summary results of the impact analy
Jan 1, 2001
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall MineBy Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay
"Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o
Jan 1, 2019