Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Derrick high frequency fine screening technologies in Kelsey Jig zircon tailings recovery (DuPont, Starke, Florida)By C. P. Kelley, T. J. McKeon
Several recent developments in fine screening technology have been implemented at the DuPont Starke, Florida plant allowing enhanced zircon recoveries while minimizing operator requirements and total
Jan 1, 2005
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector FacilityBy Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Transfer Function Model Of Phosphate Heap LeachingBy M. Weatherspoon, S. Gebo, K. Prisbrey
Our objective was to develop a transfer function model of phosphate heap leaching for design, optimization and control. The procedure included analysis of time-lapse photography of a laboratory heap.
Jan 1, 2001
-
State Summaries ? ArizonaBy N. Niemuth
Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea
Jan 1, 2008
-
Reducing Longwall Noise With Acoustical Material On The Shields - 4 Preliminary Analysis – Preprint 97-108By A. D. Prokop, J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Feb 24, 1997
-
Inspection of a Brick-Lined AqueductBy Paul S. Fisk, Arne Fareth, Julie Frietas, Francis Lo, Fidel L. Mallonga
INTRODUCTION This report describes the inspection of parts of the New Croton Aqueduct (NCA)undertaken for the New York City Department of Environmental Protection (NYCDEP)by Parsons Brinckerhoff Qu
Jan 1, 2007
-
Site Specific Blasting Model For Mine-To-Mill OptimizationBy K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Evaluation Of Dust Exposures Associated With Mist Drilling Technology For Roof BoltersBy T. W. Beck
Overexposure to respirable dust remains a widespread health hazard to roof bolter occupations in underground coal mines. Recently implemented mist drilling technology was evaluated for its effectivene
Jan 1, 2008
-
Application of Dot Tunneling Method to Construction of Multi¬service Utility Tunnel Adjacent to Important StructuresBy Akihiro Higashide, Roy H. Patten
The DOT Tunneling method combines two conventional earth pressure balance shield machines in an overlapping cylindrical arrangement. The method allows two tunnels to be driven simultaneously with mini
Jan 1, 1995
-
Soft Ground Tunneling Issues Handled by Partnering—A Win-Win Project in Rancho Cordova, CaliforniaBy Jack Magtoto, Lysa Voight, Tom Martin, John Forero
SUMMARY Commitment by all parties to partnering goals established early in the contract aided Affholder, Inc. in constructing 2,360m (7,700') of soft ground tunnel in Rancho Cordova, CA. Desp
Jan 1, 2007
-
Tunnelling Under The Harlem RiverBy Jacek B. Stypulkowski
This paper discusses the challenges faced by the design team of the under-river crossings of electric transmission feeders in New York City, a densely populated urban area. The under-river crossing of
-
Security of supply, sustainability and resource efficiencyBy J. Geisler
When addressing Germany’s resource supplies, we need to distinguish between those domestically available and imported ones. Resource extraction ostensibly competes with the designation of protection a
Jan 1, 2011
-
Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case StudyBy Kevin Andrews, Terry Hamric, Scott Nelson
"Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini
Jan 1, 2019
-
Risk Aspects Of Exploration Target Selection ? IntroductionBy Robin G. Burn
An orebody is a mining company's greatest asset; without it there can be no mine. Yet, by the very nature of the industry, orebodies are wasting assets whose progressive depletion must be balance
Jan 1, 1984
-
Operators Use First-Out Fault Detection To Dramatically Reduce Equipment DowntimeBy R. Schulz, K. King
Concentrating Line 6 just went down again. The control room operator checks the graphic display. Only one piece of equipment shows an alarm. Clicking on the ball mill icon, he discovers the culprit wa
Jan 1, 2001
-
The Sir Adam Beck II Intake Tunnels—Homage To The BuildersBy Clair Murdock, David Heath
The 1,280 MW Sir Adam Beck II Hydroelectric Project was constructed in the1950s, at Niagara Falls, Ontario, Canada. The twin intake tunnels total over 17 kilometers in length and pass deep below the C
Jan 1, 2007
-
Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, SlovakiaBy Chikaosa Tanimoto
INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con
-
Electric Rope Shovel MonitoringBy J. Hansen
This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o
Jan 1, 2001
-
Using electrostatic precipitation to control diesel exhaust particulate emissionsBy A. Farnoud
Thousands of miners, construction workers, and truck drivers are exposed to diesel exhaust particles. Diesel Particulate Matter (DPM) is a probable human carcinogen and stringent occupational and envi
Jan 1, 2009
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005