    Updated Study of a Low Overburden Longwall Recovery with Pre-Developed Recovery Entry

    By J. C. Stankus, R. Ochsner, B. Hanson

    "Bull Mountains No. 1 mine of Signal Peak Energy made another success in its 4 Right pre-developed recovery entry on March 23 and 24, 2015, after the first successful cut-through and shield retrieval

    Jan 1, 2016

  • SME
    Applications of Wireless Indoor Positioning Systems and Technologies in Underground Mining: a Review - Mining, Metallurgy & Exploration (2021)

    By Rushikesh Battulwar, Javad Sattarvand, Joseph Seamons, Masoud Zare

    In the last decade, new developments took place in the area of indoor positioning (or localization). Since the Global Navigation Satellite System (GNSS) cannot be used in underground mines, other tech

    Sep 5, 2021

  • SME
    Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023

    By Andrew Chegwidden, Tara Wilk

    Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o

    Jun 13, 2023

  • SME
    Opencast Mining Of Brown Coal In Eastern Europe (53316393-306c-401a-9c67-5ad911520cfd)

    By Yoginder P. Chugh

    Most mines are large producing 0-25 mmt annually. The coal is mine.) at depths ranging from .0-150 m 120-500 ft mining at 300 m .(,1000 ft) depth is anticipated in the future. Single and multiple seam

    Jan 1, 1980

  • SME
    Heap Leach Solution Application At Coeur-Rochester (b25c6c16-b3b4-42ec-816f-c1af312bfe3e)

    By A. L. Wilder

    Coeur d'Alene Mines Corporation's newest precious metals property is located in the old Rochester Mining District approximately twenty-five miles northeast of Lovelock, Nevada. Built at an e

    Jan 1, 1988

  • SME
    The Alumbrera Pipeline, World's Longest Copper Ore Concentrate Sluny Pipeline

    By Fred Morelko, Michael Connelly, Brad L. Ricks

    INTRODUCTION The $1.1 billion Bajo la Alumbrera Project, started up in 1997 by Minera Alumbrera Limited in the Catamarca Province of Northwestern Argentina, is the first large scale modern mining p

    Jan 1, 1998

  • SME
    Development Metallurgy Guidelines for Copper Heap Leach

    By J. E. Dreier, R. E. Scheffel, A. Guzman

    "This paper outlines a comprehensive, cost-effective testing program for the acid-ferric sulfate heap leaching of oxide, supergene and primary copper ores. It is based on extensive experience in coppe

    Jan 1, 2016

  • SME
    3. Computer-Assisted Mineralization Modeling at Kennecott Copper Corporation ? Introduction

    By R. K. Davey

    Before the introduction of computerized procedures, mineralization modeling (compilation of level maps), ultimate pit studies, ore reserve compilations, and long-range mine planning all were performed

    Jan 1, 1979

  • SME
    Simulation of Thermal Effects on the Flow Field in a Pilot-Scale Kiln - Mining, Metallurgy & Exploration (2021)

    By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG

    The flow field and coal combustion process in a pilot-scale iron ore pelletizing kiln is simulated using a computational fluid dynamics (CFD) model. The objective of the work is to investigate how the

    Apr 20, 2021

  • SME
    Surface Coal Mine Blasting Near Transmission Pipelines

    Industry and regulatory agencies have requested guidance on safe blasting near transmission pipelines. The U.S. Bureau of Mines and AMAX Coal Company have studied surface coal mine overburden blasting

    Jan 1, 1994

  • SME
    Myths In Grinding Mill Q.A. -Uncovering The Costs (ae289d48-02bd-40c1-b9cd-43039ca5a205)

    By V. Svalbonas

    The process of grinding mill quality assurance brings with it associated truths and myths. When the mill quality assurance process took its first great steps forward in the late 1970s and early 1980s,

    Jan 1, 1999

  • SME
    Ground rippability classification by decision trees - SME Transactions 2015

    By E. Siami-Irdemoosa, S. R. Dindarloo

    Ease of excavation or rippability, also called diggability or excavatibility, is a critical decision-making parameter in the selection of both the overburden removal method and the required equipment

    Jan 1, 2015

  • SME
    Limestones Of New Mexico And Adjoining Areas Suitable For Sulfur Removal In Coal-Fired Power Plants (8b951c7c-73f1-4033-8b29-9832c5c59739)

    By Frank E. Kottlowski

    Widespread high-calcium (HC) limestones in New Mexico and adjoining areas, are low in magnesium, but some units include shale interbeds that would be deleterious for usage in sulfur removal. In southw

    Jan 1, 1995

  • SME
    The Effect of Overburden Depth on Casing Deformations of Shale Gas Wells in Longwall Chain Pillars—Recent Mine-by Experiences

    By Peter Zhang, Daniel Su, Berk Tulu, Bo Hyun Kim, Zoheir Khademian

    Over 2,000 shale gas wells have been drilled in the Pittsburgh Seam longwall reserves. As longwall panels are laid out, some of these shale gas wells must be located in longwall chain pillars. With lo

    Jun 25, 2024

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    Analysis of Effect of Waterhead on Stability of Excavation Face of Slurry Balanced Shield

    By Ming-yi Zhang, Zhong-nian Yang, Xiao-ming Guan, Quan-wei Liu

    "In slurry balanced shield tunneling, how to ensure the safety of construction and to reduce the influence on the environment has arisen wide attention of scholars both at home and abroad. But now it

    Jan 1, 2016

  • SME
    The Efects of Rock Mass Strength and Joint Orientation on Pillar Stability in Underground Coal Mines

    By S. M. Hossaini, M. Ataei, H. Moosavi

    The abstract highlights the importance of pillar stability in underground coal mines and the influence of rock mass strength and joint orientation on pillar behavior. The study employs numerical model

    Apr 4, 2022

  • SME
    2022 MPD Student Poster Contest – Winning Abstracts

    By Qingqing Huang, Mohammad Rezaee

    The Mineral & Metallurgical Processing Division (MPD) of the Society for Mining, Metallurgy & Exploration held the 12th MPD Student Poster Contest on March 2, 2022, during the MINEXCHANGE 2022 SME Ann

    Nov 22, 2022

  • SME
    Evaluation Of Best Management Practices For Mining Solid Waste Storage, Disposal, And Treatment - A Status Report ? Introduction

    By Jack S. Greber

    The mining industry generates an estimated 2.3 billion tons of solid waste each year and the total accumulated mineral resource solid waste at both active and inactive mine sites, approaches 30 billio

    Jan 1, 1981

  • SME
    Application Of Best Available Technology To Reclamation Design And Integration With Mine Planning ? Introduction ? Preprint 09-085

    By H. J. Hutson

    BRS, Inc. has utilized Carlson's Natural RegradeTM software to design the reclamation and stabilization of abandoned open pit uranium mine spoils, AML Project 16N, located in the Gas Hills Uraniu

    Jan 1, 2009