Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Chimney Hollow Reservoir Project Inlet/Outlet Tunnel Excavation and Valve Chamber Construction - NAT2024

    By Kyle Kittle, Kyle Knaeble, Albert Ruiz, Gregory Raines, Ryan Gewargis

    The Chimney Hollow Reservoir Project (CHRP) is located southwest of Loveland, Colorado. CHRP is a component of the Windy Gap Firming Project, operated by the Municipal Subdistrict of the Northern Colo

    Jun 23, 2024

  • SME
    Preparedness of Ghanaian Mine Stakeholders for the Adoption of Autonomous Surface Mining Systems

    By C. K. Arthur, N. K. Dumakor-Dupey, B. A. Kansake, F. A. Kaba

    Autonomous mining systems have been deployed for improving mine performance. However, there is a fear of job losses. Adoption of autonomous systems is envisaged to be resisted by major stakeholders in

    Jan 1, 2019

  • SME
    The HWPT Engineered Membrane Separation® (EMS®) Method Of Copper Recovery From Acid-Minesite-Solutions (AMS) - Preprint 09-042

    By J. A. Lombardi

    Acid-Minesite-Solutions (AMS) are defined as copper-containing pit lake, tailing pond, acid-mine-drainage, and heap and waste dump irrigation solutions. All of these solutions are characterized by co

    Jan 1, 2009

  • SME
    Roof and pillar failure associated with weak floor at a limestone mine - SME Transactions 2015

    By J. L. Ellenberger, G. S. Esterhuizen, T. Miller, M. M. Murphy

    A limestone mine in Ohio has had roof instability problems that have led to massive roof falls extending to the surface. This paper describes a collaborative study of these events undertaken by the Na

    Jan 1, 2015

  • SME
    Ore Reserve Estimation and Computer Modelling

    By Mark Laffoon

    Gold Fields Operating Co.-Chimney Creek has conducted numerous ore reserve modeling studies In order to optimize the estimates of the gold grades and tonnage distributions. Improved models continue to

    Jan 1, 1991

  • SME
    Geology And Evaluation Of The Asbestos Hill Orebody

    By R. V. Stewart

    This chrysotile asbestos orebody is located near the northern tip of the Province of Quebec, Canada. It is some 1818 km (1130 mi) north of Montreal; 480 km (300 mi) north of the tree line and is situa

    Jan 1, 1978

  • SME
    Diesel Aerosols in an Underground Coal Mine

    By Jared Winkler, Jon A. Hummer, Aleksandar D. Bugarski, Shad Peters, Steven E. Mischler, Steve Cochrane, Shawn Vanderslice, Teresa Barone

    The case study assessed submicron aerosols at a continuous miner (CM) section, diesel aerosol concentrations at the longwall (LW) section, and elemental carbon (EC) and total carbon (TC) exposures. Ae

    Mar 16, 2022

  • SME
    Spectroelectrochemistry of Enargite III: Alkaline Sulfide Leaching

    By H. Huang, R. N. Gow

    "The reactivity of an enargite mineral electrode was investigated spectroelectrochemically under conditions typically found in alkaline sulfide leach solutions, with pH 11-13 and Na2S additions of 50

    Jan 1, 2015

  • SME
    Recovery Of Silver And Gallium From Flue Dust With Acidified Thiourea Solutions

    By B. Pesic

    The recovery of silver and gallium from flue dust with acidified thiourea solutions was examined. The studied parameters were temperature, particle size, thiourea concentration, acid concentration, an

    Jan 1, 1986

  • SME
    Electricity And Circulation Fluidized Bed Power Technology

    By Robert Giglio

    Looking back over the last 150 years or so, it is not hard to see that electricity has been a primary force in shaping human development. It has been a basic ingredient in our industrial revolutions

    Jan 1, 2009

  • SME
    Scaling Mine Pillar Size And Shape With The 'P Function

    By L. A. Panek

    A new pillar strength formula is presented, incorporating a function P of size and shape, which takes into account the size-shape interaction effect as well as the enhanced strength exhibited by wide

    Jan 1, 1994

  • SME
    How Blasthole Shock Absorbers Reduce Costs

    By Jack T. Work

    Spiraling costs in every segment of the open-pit mining cycle is a fact of life that every operator must reckon with. The introduction of various shock absorbing devices for rotary drilling is one rec

    Jan 4, 1980

  • SME
    Thallium Removal Through Modification Of Metal Hydroxide Precipitation Schemes

    By K. Vatterrodt

    Thallium is not significantly removed from mining influenced water (MIW) through conventional treatment in hydroxide precipitation plants. We experimentally investigated modifications to hydroxide pre

    Feb 27, 2013

  • SME
    Production Of Magnetic Superconcentrates By Cationic Flotation

    By Robert B. Tippin

    A number of recent studies 1-4 suggest that steelmaking expansion might be achieved more economically by a combination of the prereduction furnace and the electric steelmaking furnace rather than thro

    Jan 1, 1971

  • SME
    Coal Resources For The Future: Summary Results Of The Us Geological Survey National Coal Resource Assessment

    By B. S. Pierce

    The National Coal Resource Assessment – 2000 project was a multi-year effort by the U.S. Geological Survey to identify, characterize, and assess the coal resources that will supply a major part of the

    Jan 1, 2001

  • SME
    Layered Deposits - Syngenetic And Epigenetic.

    By George W. Bain

    Deposits of metals in only slightly disturbed strata have been attributed to sedimentation processes contemporary with deposition of the strata. Recently this origin has been extended' to a great

    Jan 1, 1966

  • SME
    Numerical Investigation of the Effect of a Novel Wet Scrubber on Dust Reduction in an Underground Coal Mine Mining, Metallurgy and Exploration

    By Thomas Novak, Sampurna Arya

    Controlling dust generation and keeping it below permissible limits to meet federal dust standards at the working face of a roomand-pillar coal mine is a challenge for a mine operator. With the recent

  • SME
    A New Optimum Pit Limit Design Algorithm

    By Yixian Zhao

    Although many ultimate pit limit design algorithms have been developed for the past one- quarter century, only the well known Lerchs-Grossmann's (LG) algorithm is capable of producing a truly opt

    Jan 1, 1992

  • SME
    Andacollo Gold Production – Ahead of Schedule and Under Budget

    By G. Mike Bernard

    The Andacollo gold mine is located near the town of Andacollo (population 14,000 people) in Chile’s region four. It is about 56km (35 miles) by paved road from the coastal city of La Serena. Santiag

    Jan 1, 1996

  • SME
    Stress Relief To Control Coal Bursts

    By K. Y. Haramy

    Deep coal mines with strong roof and floor rock frequently encounter face and rib bursts. The burst problem is becoming more severe as mining depth increases, prompting efforts to relieve high stress

    Jan 1, 1987