Electronic Detonator Timing Approaches for Surface Quarries and Metals MinesBy Tristan Worsey, Nathan Rouse, Evan Thibaud
Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl
Jan 21, 2025
-
Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stabilityBy Glenn Tobin
The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a
Jan 1, 2012
-
Coyote Shooting at Pennsylvania Glass Sand Corporation Berkeley Springs, West VirginiaBy D T. Froedge
This paper is a presentation of a coyote shot at the Oriskany Sand Quarry of the Pennsylvania Glass Sand Corporation, Berkeley Springs, West Virginia.
Jan 1, 1982
-
Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle MineBy Tony Francelj, D. Scott Scovira, Remi Proulx
The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi
Jan 1, 2002
-
Crack Displacement and Vibration Measurement of an Underground PortalBy Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.
Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla
Feb 1, 2020
-
Blast Optimization Through Drilling Information: GBlast®, a Predictive Modeling SoftwareBy Claudio Lechuga, Carlos Scherpenisse, Juan Rafael Otaiza
From the analysis of drilling process, Block Model information, drilling pattern data and expected fragmentation targets; GBlast® software optimizes the explosive charge design in order to standardize
Feb 1, 2020
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial EstablishmentBy Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav
The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e
Feb 6, 2023
-
Shock Impedance Method Applied to Detonation Pressure MeasurementsBy Santiago Gómez, Pablo Segarra, José A. Sanchidrián
In-hole detonation pressure measurements are unusual in the production environment of a mining operation, partly owing to the hostile conditions to which recording equipment and pertinent probes must
Feb 6, 2023
-
The Effects of Various Wet-Hole Loading Methods on Powder FactorBy Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Risk-based Explosives Safety Assessment In Switzerland And EuropeBy Andreas Bienz
The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor
Jan 1, 2007
-
"Optimized Energy Distribution in Bench Blasting Through Measurement Techniquesand “Multi Energy” Explosives"By Pierre De Pasquale, Gilles Jauffret, Ricardo Chavez
"When blasting in quarries or mines, the main source of inconsistent results is directly related to thenon-homogeneous energy distribution through the rock-mass volume. This variation has differentori
Jan 1, 2016
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development ProjectsBy Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure BlastingBy Tyler Acorn
In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot
Jan 1, 2011
-
Effect of Geology and Mechanical Properties of Rock on Blast ResultsBy Ph. D. Favreau, Favreau Patrice B. Eng, R. F.
Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a
Jan 1, 2019
-
Blast Monitoring Using High Speed Video Research EquipmentBy Scott G. Giltner, Paul N. Worsey
During the short duration of an explosive blast, many events occur which are too quick to be detected or observed in detail with the naked eye or by normal photographic techniques. Through the use of
Jan 1, 1986
-
Dig Instrument By BlastingBy Jikai Rong Changai Liu
The dig instrument by blasting is a,new product we developed(See Fig. 1) It is an apparatus to dig hole at the ground. It is composed of combustor A, combustor B, charge pipe and shock head. Work char
Jan 1, 1998
-
Factors Governing the Muck Pile CharacteristicsBy David Cheung, S. Paul Singh
"The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie
Jan 1, 2017
-
Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle MineBy D. Scott Scovira, Remi Proulx
The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco
Jan 1, 2000
-
Minimising Coal Damage and Loss Due to Cast BlastingBy Tapan Goswami
The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research