Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

    By Tyler Acorn

    In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot

    Jan 1, 2011

  • ISEE
    Effect of Geology and Mechanical Properties of Rock on Blast Results

    By Ph. D. Favreau, Favreau Patrice B. Eng, R. F.

    Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a

    Jan 1, 2019

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam

    Feb 1, 2020

  • ISEE
    Natural Cavities in Iron Ore Deposits in Brazilian Northern Region: Challenges and Strategies

    By Anderson Meireles, Leonardo Soares Chaves, Raul Carretero Hoz, Carlos Eduardo Soares Feliciano, Renato Jacome Costa

    The large iron deposits in the northern region of Brazil located in the Amazon Craton have in common the presence of natural cavities. These cavities primarily occur in the upper layer of the ore body

    Jan 21, 2025

  • ISEE
    Blast Monitoring Using High Speed Video Research Equipment

    By Scott G. Giltner, Paul N. Worsey

    During the short duration of an explosive blast, many events occur which are too quick to be detected or observed in detail with the naked eye or by normal photographic techniques. Through the use of

    Jan 1, 1986

  • ISEE
    Dig Instrument By Blasting

    By Jikai Rong Changai Liu

    The dig instrument by blasting is a,new product we developed(See Fig. 1) It is an apparatus to dig hole at the ground. It is composed of combustor A, combustor B, charge pipe and shock head. Work char

    Jan 1, 1998

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Impact of Blasting on Resource Recovery, Mining Profit, Safety, and the Environment

    By Z X. Zhang

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    Modeling Reactive Sulfide Rock at the Red Dog Mine

    By Norman Paley, Zachary Pickett

    The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat

    Feb 1, 2020

  • ISEE
    Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations

    By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro

    Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design

    Feb 6, 2023

  • ISEE
    Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal Mine

    By Ajoy Singh

    A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex

    Jan 1, 2012

  • ISEE
    Ignition and Growth Reactive Flow Model for Aluminized Emulsion Explosive

    By Ulf Nyberg, Changping Yi, Daniel Johansson, Håkan Schunnesson

    To investigate the non-ideal detonation properties of aluminized emulsion explosive, a series of tests for an emulsion explosive with 5% aluminum powder additive were carried out with mortar confineme

  • ISEE
    Repeated Blasting: Fatigue Damaging or Not?

    By Mark S. Stagg, David E. Siskind

    The Bureau of Mines arranged to have a wood-frame test house built in the pat of an advancing surface coal nine so it could investigate the effects of repeated blasting on a residential house. Structu

    Jan 1, 1985

  • ISEE
    Explosives Notified Bodies - For Safety in Europe

    According to the Directive 93/15/EEC, given on 5th of April 1993, all the commercial explosives placed on the market and transfered in European Union and EFTA countries have to be certified and contai

    Jan 1, 2004