Quality Assurance Of Augercast Piles With Computerized Monitoring - SummaryBy Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
Behavior Of PCC Pile Under Lateral LoadBy Zhitao Ma
The Cast-in-place Concrete thin-wall Pipe pile, referred to as PCC pile, is a new kind of pile for soft ground improvement. In this paper, firstly, the general introductions of the new pile technique,
Jan 1, 2006
-
Brightman Street Bridge Replacement ProjectBy Arturo Ressi di Cervia
Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc
Jan 1, 2003
-
Reliability Of Pile Prediction Methods - SummaryBy M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - SummaryBy Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Analysis Of Piled Raft Foundation ? SynopsisBy Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
Non-Linear Analysis Of Large Pile Groups For The New Wembley StadiumBy S. Hardy
The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu
Jan 1, 2006
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
Application Of PCC Piles On Soft Ground Improvement Of ExpresswaysBy Hanlong Liu
The construction process and load-bearing behaviors of Cast-in-place Concrete Thin-wall Pipe Piles are analyzed based on its application on Yan-Tong Expressway project. The low strain test, static loa
Jan 1, 2006
-
Design Of The Foundation Of Zhu Jiang Fanying High-Rise Building Complex ? SynopsisBy A. F. Deng
A general description of the project, mainly the pier foundation design of the ZHU JIANG FANYING is presented in the paper. The major contents include the foundation scheme, the evaluation of bed-rock
Jan 1, 2010
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, LondonBy J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989
-
An Analysis Of Interaction Between Laterally Loaded Structure And SoilBy Zhu Tonghao
A method of calculating anti-slide pile, sheet pile, underground diaphragm and structure with anchors etc. is proposeed in the paper. The effect of the various layers of soil, anchors and bracings etc
Jan 1, 1991
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel HammersBy R. D. Short
Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali
Jan 1, 1989
-
Piled Raft On Layered SoilsBy Luca de Sanctis
The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th
Jan 1, 2002
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010
-
2D And 3D Analysis Of New Austrian Tunnelling MethodBy G. R. Dasari
New Austrian Tunnelling Method (NATM) has been analysed by Finite Element method in two and three dimensions by Strain Dependant Modified Cam Clay (SDMCC) Model. The effects of construction sequence,
Jan 1, 1996
-
Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of CanadaBy Richard Deakin
This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and
Jan 1, 2011