Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993

  • CIM
    Case Studies in the Use of the Falcon Gravity Concentrator

    By S. McAlister

    "Falcon Concentrators Inc. has developed a high capacity centrifuge for the recovery of fine, free gold as well as other metals and minerals which were previously thought to be unrecoverable by gravit

    Jan 1, 1992

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Resin-grouted cable supports for coal mine ground control

    By S. C. Tadolini, J. M. Goris, J. L. Gallagher

    Cable supports offer several advantages over traditional secondary support methods by enhancing stress redistribution to pillars and gob areas, minimizing or eliminating timbers and cribs that reduce

    Jan 1, 1999

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • CIM
    EKATI Safety Guarantee A Conversation for an Extraordinary Possibility

    By Richard Morland

    Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm

    May 1, 2010

  • CIM
    Activated Carbon’s Use in Gold Adsorption and Recovery (Presented with Consideration to the Operator’s Point-of-View) Scotia International of Nevada, Inc

    By Michael Drozd

    "The operation of an activated charcoal system has five separate unit operations. These unit operations have common points for CIP, CIL and CIS system, which vary widely in application.The unit operat

    Jan 1, 2008

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • CIM
    ERG Tailings Retreatment Project

    "INTRODUCTIONGold tailings retreatment plants have been operated for many years throughout the world. Several large tailings retreatment facilities have been operated profitably in South Africa since

    Jan 1, 1989

  • CIM
    Learning From Experience: Aboriginal Programs In The Resource Industries

    By Barrie Robb

    Outline 1. Mackenzie Aboriginal Corporation (MAC) 2. ACR background 3. ?Learning from Experience? project - What - Why - lessons 3. How Industry could contribute to sustainable Aboriginal comm

    May 1, 2008

  • CIM
    A Touch of Froth: How Bubble-Particle Aggregates Take the Strain

    By Marco A. Vera

    "This paper investigates the froth function in flotation and the associated upgrading process. Flotation literature has revealed that one of the main functions of the froth phase is the cleaning of bu

    Jan 1, 2003

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • CIM
    Sulphur Compounds and Metal removal using Bioprocess Technology

    By Andre L. De Vegt, Cees J. N. Buisman

    "For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st

    Jan 1, 1997