Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The North American Energy Dilemma - What Does It Mean for the Mining Industry?

    By J. M. Whiting

    "North America has entered a period when greatly increased attention must be given to energy .supply and demand by government, industry and individuals. Such increasing concern about energy will be a

    Jan 1, 1973

  • CIM
    Engineered Completions Increase Oil Recovery

    By R. W. Coburn

    The results of field experiments on wells which required stimulation indicated that engineered well-completions will cause an increase in ultimate recovery at reduced costs. Techniques and tools have

    Jan 1, 1960

  • CIM
    Z1600 Jameson Cell Test Rig – From Rental to Revenue

    By A. Taylor, M. Blanchette, J. Doucet

    "A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i

    Jan 1, 2012

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • CIM
    Boulby Mine Backfill System: Operational Experience

    By M. Keen

    The backfill system at Cleveland Potash?s Boulby Mine places waste filter cake underground in the form of a high concentration slurry in worked out areas of the mine reducing the mine?s environmental

    May 1, 2007

  • CIM
    Setting the Record Straight

    By Don Thompson

    It isn?t a lie if you don?t tell the whole truth The pictures National Geographic didn?t print Other photos National Geographic didn?t print?

    May 1, 2009

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    The Round Mountain Gold Project: Operation of a Mill and Heap Leach Facility in Nevada

    By Richard Frentress, Dave Donelon, Robert Henderson, Mike Warnert

    "The Round Mountain gold mine is an open-pit mining operation located 97 kilometres north of Tonopah in Nye County, Nevada. Gold has been produced from the property since 1906.Gold is currently recove

    Jan 1, 2005

  • CIM
    Predicting Nickel Recoveries at the Thompson Mill from Feed Mineralogy

    By F. D. Ford, Z. Dai, A. Byers

    Manitoba Mining and Milling operations consist of three underground mines (Thompson T1, T3 and Birchtree), feeding the Thompson Mill. Three years ago, a collaborative effort involving Mines Exploratio

    Jan 1, 2015

  • CIM
    Efficient Enhanced Gravity Separation Using the Kelsey Centrifugal Jig

    By Peter Barker, Terry Jones

    "The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully and effic

    Jan 1, 2007

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    Advances in Mine Engineering to Enable Information Mobility for ?Intelligent Mining?

    By Leslie McHattie

    ?Intelligent mine? conjures up a futuristic image of unmanned extractors and loaders working in harsh conditions in a remote lunar landscape. The promise of increasing mine fleet productivity and solv

    Aug 1, 2013

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Diamonds: A Canadian Perspective

    By John Lindsay

    "Although diamond mining is a relative newcomer to the Canadian mining industry, with the first diamond mine coming on stream in 1998, Canada is already a significant producer of high quality diamonds

    Jan 1, 2003

  • CIM
    Adaptable Inspection Sensor for Unpiggable Pipelines

    By P. Mundell, R. Torbin

    "There are many physical and operational obstacles in pipelines that make the passage of inspection robots impossible including:•,Small radius bends•,Low operating pressure•,Plug valves•,Large changes

    Jan 1, 2005

  • CIM
    A Study of Polynary Uranium Mo-Zr-Nb-V Alloys

    "In a continuing investigation into the development of uranium alloys for armament applications, some complex base alloy corn positions were modified by varying the amount of alloying elements and by

    Jan 1, 1968

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    The Sherritt-Cominco Copper Process ? PART I : The Process

    By G. M. Swinkels

    Sherritt Gordon and Cominco, with financial assistance from the Canadian Government through PAIT, have developed a hydrometallurgical process for refining copper from sulphide concentrates. The main o

    Jan 1, 1978