Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Upgrading of aluminum dross by selective comminution and sizing

    By K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri

    "Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe

    Jan 1, 1987

  • CIM
    Development of an On-line Vibration Based Fault Detection Systems for an Electric Mining Shovel

    By Markus Timusk

    This paper describes a research project that focuses on developing a diagnostic routine to assist in decision support for the condition based maintenance of mobile mining equipment subject to unsteady

    May 1, 2004

  • CIM
    Engineers Canada Partnerships

    By Stephanie Price

    Engineering Associations ?Regulatory authority ?License individuals and firms ?Discipline licensed members ?Enforce against improper acts ?Programs for EIT?s, competence, etc

    Oct 1, 2010

  • CIM
    An Overview of Potash Flotation

    By D. Imeson, T. Grammatikopoulos, M. Aghamirian, M. Oliazadeh

    "More than 70% of potash is produced worldwide by froth flotation. Flotation of potash was developed in the early 1930s. Amines are widely used for flotation of sylvite (KCl) from halite (NaCl) and in

    Jan 1, 2012

  • CIM
    Troubleshooting Flotation Cell Operation Using Gas Velocity Measurements

    By Donald Leroux, Ralph Dahlke, Dave Scott, Finch. James A., Cesar O. Gomez

    "The efficiency of the flotation process depends on how effectively air is dispersed into small bubbles. Bubble surface area flux - the surface area of bubbles per unit time per unit cross-section are

    Jan 1, 2001

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    Applications of geophysical methods to resource development in northern Canada

    By A. E. Taylor, A. S. Judge, P. T. Lafleche

    "Resource development in northern Canada has special requirements which derive from the unique environmental and eco-logical nature of the northern environment. In this paper several case histories in

    Jan 1, 1987

  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • CIM
    Gold Deportment Studies on a Copper-Gold Ore - A Systematic Approach to Quantitative Mineralogy Focusing on Diagnostic Metallurgy

    By Aparup Chattopadhyay, Barun K. Gorain

    "Porphyry copper deposits are the most important source of copper and also gold within the orogenic belts. These deposits are characterized by low grade copper ore (0.2% to 1% copper) and host preciou

    Jan 1, 2013

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)

    By K. Swedburg, M. Samuels

    "The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized

    Jan 1, 2016

  • CIM
    Ivanhoe New Horizons

    By Jess Harding

    Oyu Tolgoi investment agreement now in full, legal effect Successful completion of a series of conditions to 2009 Investment Agreement was announced March 31, 2010. Full-scale construction now set t

    May 1, 2010

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    A Non-Nuclear Density Meter and Mass Flow System Measuring Mining Slurries with Entrained Gas

    By R. H. Batey

    "The process control and cost of monitoring mining slurries is normally accomplished using a continuous mass flow system, conventionally embodying a volumetric magnetic flow meter and nuclear density

    Jan 1, 2013

  • CIM
    Purification of solid from secondary aluminum smelting dross

    By J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.

    Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,

    Jan 1, 2005

  • CIM
    Pressure Leaching of Copper-Cobalt-Zinc Containing Calcine with the Outotec Pressure Oxidation Process

    By Mehmet Canbazoglu, Kaarlo Haavanlammi, Hannu Laitala

    Cobalt is currently a critical metal because of the increasing number of electrical vehicles forecast for production. Copper and zinc are base metals that are used in many everyday applications, inclu

    Jan 1, 2019

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • CIM
    Geometallurgical Modeling of the Dumont Deposit (0daa1b2e-54ab-4163-adcf-32c9366ffe5b)

    By K. Nasrallah

    "The Dumont deposit is a large (1,179 Mt proven and probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporatio

    Jan 1, 2016

  • CIM
    Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New Brunswick

    By A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.

    "The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali

    Jan 1, 2008

  • CIM
    Goldex, the GRG Jewel

    By G. Belzil, F. Robichaud, M. Fullam

    "The Goldex mining and milling complex is operated by Agnico-Eagle Mines Ltd. and is located in the Abitibi greenstone belt of Northwest Quebec, Canada. The mill operates presently at a throughput of

    Jan 1, 2012