Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Shear-Bond Strength of Thin Spray-on Liners as a Surface Support Mechanism in Underground Rock Support – A Review

    By D. Kalumba, S. Jjuuko

    "Thin Spray-on Liners resist relative small deformations (< 1 mm) between rock blocks or fragments in terms of a combination of shear, adhesive and tensile-bond strengths. Shear-bond strength addresse

    Jan 1, 2015

  • CIM
    Deportment of selected minor elements at the DBMS zinc pressure leach plant

    By G. J. Desroches, E. Ozberk, M. J. Collins, B. D. Krysa, I. M. Masters

    The zinc refinery of Hudson Bay Mining and Smelting Co., Ltd. went through a major modernization in 1993, when the roaster and the calcine and fume leach circuits were replaced by a new Sherritt zinc

    Jan 1, 1995

  • CIM
    Copper Production Trends and Developments a Review of Industry Trends Over the Past Decade

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    In the decade 2002 to 2012 some 6.7 million tonnes of new copper concentrate production capacity was brought on line, corresponding to 2 million tonnes of contained copper. This increase in concentrat

    Jan 1, 2014

  • CIM
    Design and Construction of the Backfilled Pit Cover System at Whistle Mine, Canada: A Case Study

    By Brian K. Ayres

    Inco Limited, Ontario Division is currently in the process of decommissioning the Whistle Mine site located near Sudbury, Ontario, Canada. The most significant component of site decommissioning involv

    Apr 1, 2005

  • CIM
    SAG and Ball Mill Circuit Layout and Design (f5d48ee8-8f45-4465-ae05-c13a7b07d4ee)

    By S. Perkins, E. Young, L. Dufour, K. McVey, L. Rolandi

    This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co

    Jan 1, 2012

  • CIM
    Compilation of geology theses, 1991-1993. Part IIE-F: Abstracts of selected theses at Canadian Earth Science Departments

    By Wouter Bleeker, Isabelle Cadieux

    "Abstracts of theses related to mineral deposit studies and exploration, completed at geology or earth science departments of Canadian universities, have been compiled for the period 1991 to mid-I993.

    Jan 1, 1994

  • CIM
    Effect of Static Precipitation on Microstructue and Texture of Warm Rolled Mg-Al-Sn Alloy

    By A. S. H. Kabir, I-H. Jung, J. Su, S. Yue, M. Sanjari

    The final mechanical properties of wrought magnesium alloys are mostly controlled by microstructure and crystallographic orientation or texture. In common magnesium alloys, grain coarsening occurs dur

    Jan 1, 2014

  • CIM
    Fire-retardant conveyor belts: Testing and standards

    By K. J. Mintz

    Conveyor belts installed in an underground mine can be a potential source of a major fire, thus the need for fife-retardant belting. A Canadian Standard, CAN/CSA-M422-M87, incorporating a small-scale

    Jan 1, 1992

  • CIM
    Mineralochemical Characterization of Calcines and Flue Dusts during Neutral Roasting of Arsenic Copper Concentrates in the Pilot Plant of University of Concepción.

    By I Wilkomirsky, F. Parada, R. Parra, E. Balladares

    "The neutral roasting of As bearing copper concentrates is confirmed well established and promising option for the treatment of this type of complex concentrate. The AS elimination by volatilization a

    Jan 1, 2014

  • CIM
    Operation and Maintenance of Crushing Equipment at Bethlehem Copper

    By D. G. Ingram

    This paper reviews the operating and maintenance practices at Bethlehem Copper from the commencement of operations in November 1962 to the present. Cost data and wear life of major components are also

    Jan 1, 1979

  • CIM
    Energy Conservation at Inco Metals Company: Compressed Air in Underground Mining

    By J. G. Cullain

    In conjunction with the over-all goals of energy conservation at Inco Metals Company, a program of improvement in compressed air utilization was established. Air flows were monitored and compared to c

    Jan 1, 1979

  • CIM
    Recovery of Rare Metals from Spent Hydrodesulphurization Catalyst

    By J. Shibata, K. Manabe, A. Fuji, N. Matsunaga, D. Murakami, Yamaguchi University, T. Suzuki

    "Spent hydrodesulphurization (HDS) catalyst contains rare metals such as cobalt, nickel (Ni), molybdenum (Mo), and vanadium (V). The overall objective of this project is to develop a hydrometallurgica

    Jan 1, 2016

  • CIM
    Removal of Iron from Simulated Copper Leach Solution using a Hydroxy-Oxime Chelating Resin

    By L. Li

    Iron removal is a common procedure in hydrometallurgy of non-ferrous metallic ores. Chemical precipitation and solvent extraction are currently the main methods employed for separation of iron from co

    Jan 1, 2016

  • CIM
    In Situ Image Analysis of Batch Settling of Flocculated Minerals with Physical-Statiscal Feature Extraction Method

    By M. R. MacIver, M. P. Pawlik

    "An image analysis method based on chord length distributions is applied to the batch settling of polyacrylamide flocculated kaolin suspensions. Two features of the interaggregate void space, the void

    Jan 1, 2016

  • CIM
    Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations

    By M. Vaccarini

    In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil

    Aug 1, 2013

  • CIM
    Experimental study of the Anisotropic Behaviour of Jointed Rock Masses Under Uniaxial Compression

    The influence of joint orientation and joint persistence, on the mechanical behaviour of jointed rock masses under uniaxial compression, has been studied systematically. The joint inclination angle ß

    Jan 1, 2015

  • CIM
    The Kaiser Celestite Operation at Loch Lomond

    By G. O. Crowell

    This paper gives the history of the celestite deposit, now being mined by Kaiser Celestite Mining Ltd., near Sydney, Nova Scotia. Mining and milling procedures are covered, and the regional and local

    Jan 1, 1971

  • CIM
    In Situ Stress Measurements in a Drilling Hole Penetrated to the Tohoku-Oki Earthquake Fault: Indication of Coseismic Stress Change

    By Weiren Lin

    The Mw 9.0 Tohoku-Oki, Japan earthquake occurred on 11 March 2011 produced a maximum coseismic slip of >50 m near the Japan Trench. To investigate why the plate boundary fault between the subducting P

    Jan 1, 2015

  • CIM
    Some Factors Influencing the Rate of Dissolution of Gold in Sodium Cyanide Solutions

    By E. L. Day

    "In the early 1930s during the course of test work with a simple gold ore, it was evident that the time required to dissolve the gold by cyanidation was very much longer than should have been needed t

    Jan 1, 1967

  • CIM
    Wettability Measurements in the Selection of Extender Oils For Potash Ore Flotation

    By A. Atrafi, L. Barroilhet

    The top size of particles in the flotation of potash ores, which can be as large as 4 mm, exceeds by far the top size in other flotation plants. It is then understandable that while long chain amines

    Jan 1, 2016