Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    May 1, 2009

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    New Technology for Hoist Conveyance Monitoring and Analysis

    Many mines in Canada, the US and S. Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due the excessive weight. It has been suggested (DeLorme, 2

    May 1, 2002

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • CIM
    Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral Processors

    By D. M. Doyle

    "The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this

    Jan 1, 1974

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • CIM
    Milling Operations at Omai Gold Mines

    By Eric Konigsmann

    "Omai Gold Mines is a large scale open pit gold mining operation located in central Guyana, South America with a 12,000 tonne per day milling facility. Mill operations were initiated in December 1992

    Jan 1, 1994

  • CIM
    Community Engagement Best Practice in the mining sector: What?s recommended and who?s using it?

    By Ben Bradshaw

    Context ? Community engagement has become an increasingly significant and challenging part of mineral exploration and mine development; indeed, opposition from communities proximate to a proposed min

    May 1, 2010

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002

  • CIM
    Market Driven Performance Improvements at Brunswick

    By L. Flett, S. Woods, C. Deredin

    "Following a significant reduction in world Imperial Smelting Furnace (ISF) capacity from 2003 to 2008, a major optimization initiative was successfully carried out on the lead upgrading and bulk (zin

    Jan 1, 2013

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Review of 2004 JORC Code and Comparison with National Instrument 43-101

    By Patrick R. Stephenson

    The current version of the JORC Code was issued in 2004 and since that date the Australian Securities Exchange, in collaboration with JORC, has issued a number of companies? updates to provide guidanc

    May 1, 2010

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    Geology of the Two Duck Lake Intrusion and the Marathon Cu-PGE Deposit, Coldwell Complex, Northern Ontario

    By Richard Dahl, Richard P. Taylor, David H. Watkinson

    "Abstract - Detailed mapping of the Eastern Gabbro, Coldwell Complex, Ontario, revealed that the copper and platinum-group-element deposit on the Marathon property is confined to a coarsegrained to pe

    Jan 1, 2001

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • CIM
    SEM-XMAP: Scanning Electron Microscopy and X-Ray Dot-Mapping Applied to Cemented Paste Backfill

    By Serge Ouellet

    Identification and quantification of cementitious phases in cemented paste backfill (CPB) is difficult due to the fineness of tailings and the low binder content used in the mixture. Techniques such a

    May 1, 2007