Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Treatment of Once Rejected Material – Investigating the Recovery of Cassiterite from Tailings Disposals Using Different Flotation Methods

    By M. Rudolph, T. Leißner, TU Bergakademie Freiberg, C. Mämpel, R. Möckel, M. Embrechts, T. Leistner

    Tin-mining activities have taken place in the region of the German Erzgebirge (Ore Mountains) for over hundreds of years up until 1991. For long times, gravity separation processes used to be the domi

    Jan 1, 2016

  • CIM
    Operational Improvements at Brunswick's Lead Blast Furnace

    By A. Longval, Q. Jiao, T. Shannon

    In 2000, Xstrata Zinc (former Falconbridge Ltd.) Brunswick Smelter commissioned a modified lead blast furnace. Since then, efforts have been made to improve its operation in order to achieve optimal o

    Jan 1, 2008

  • CIM
    Application of Modified Voce-Kocks Constitutive Material Model to Elevated Temperature Forming of 7XXX Series Aluminum Sheet

    By M. K. Jain, Z. T. Xu, M. Bruhis, V. Hegedekatte

    "Strain rate and temperature dependent deformation conditions are present during elevated temperature forming of aluminum and other metallic materials. While many constitutive laws have been proposed

    Jan 1, 2018

  • CIM
    Experimental Investigation on Thermo-Hydro-Mechanical-Chemical Behaviour of Cemented Paste Backfill

    By A. Ghirian

    Once cemented paste backfill (CPB) is transferred and placed into a mine stope, various coupled mechanisms will take place in the CPB material or structure. It will be subjected to strong coupled ther

    Aug 1, 2013

  • CIM
    Methodology For Aquatic Hazard Classification Of Massive Metal Forms: The Copper Case

    By P. H. Rodriguez

    The aquatic hazard classification system of the OECD and EU requires that sparingly soluble metal substances (SSMS) be tested using the OECD Dissolution/Transformation protocol in order to quantify th

    Jan 1, 2007

  • CIM
    Limestone Resources of Alberta

    By M. E. Holter

    "Limestone-bearing strata are exposed in seven areas of Alberta, each situated adjacent to rail and road facilities. Six of these centers are located along the eastern edge of the Foothills and Front

    Jan 1, 1973

  • CIM
    Auxiliary Ventilation Layouts for Noise Control in Underground Hard Rock Mines

    By F. Calizaya, S. Bhattacharyya

    "This study presents the results of a set of sound level measurements carried out in three underground mines where auxiliary fans are used regularly. Sound levels as high as 100 dB(A) by the workings

    Jan 1, 2019

  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    Strategies and innovation in ocean transportation

    By H. R. Stoger

    "In 1994 world trade grew by 9%, the fastest annual increase since 1976. Dry cargo shipping rates are at an all time high.Panamax size bulk carriers are receiving19 000 US dollars per day for trans At

    Jan 1, 1996

  • CIM
    Slag Freeze Layer Formation In An Electric Smelting Furnace

    By F. J. Guevara

    A two-dimensional mathematical model for fluid flow and heat transfer in a sixin- line electric smelting furnace was developed to study the effects of temperature on slag viscosity in both the liquid

    Jan 1, 2007

  • CIM
    An Aqueous Particle Sensor (APS) for Micro-Bubble Detection in a Fourstrand, Full-Scale, Water Model Tundish

    By McGill Metals Processing Centre, S. Chang, L. Calzado, X. K. Cao, C. H. Hsin, M. Isac

    "Due to the increasingly stringent cleanliness requirements for final steel products, there has been a growing interest in the possible use of micro-bubbles for the removal of inclusions with diameter

    Jan 1, 2016

  • CIM
    The Influence of Shotcrete on Fluorspar Flotation and its Removal by Sensor Based Sorting

    By H. Wotruba, J. Heizmann

    "The use of shotcrete is a mandatory means for rock support and therefore for safety in many underground mining operations. If shotcrete gets into the flotation feed though, it can negatively influenc

    Jan 1, 2016

  • CIM
    Experimental Investigation on Anisotropic Characteristics of Boreyong Shale in Korea

    By Ki-Bok Min, Seokwon Jeon, Seung-Beum Choi, Taehyun Kim

    "In order to investigate anisotropic characteristics of Boryeong shale in Korea, which clearly shows transverse isotropy, a series of experimental tests were carried out. Using Brazilian test, five el

    Jan 1, 2015

  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • CIM
    Potential of Laser Welding and Friction Stir Welding for Joining AA1100-16 VOL.% B4C Metal Matrix Composite

    This work illustrates the potential of two welding processes for joining AA1100-16 vol.% B4C metal matrix composite: laser welding process using a 4 kW Nd:YAG laser and Friction Stir Welding. A compar

    Jan 1, 2011

  • CIM
    Séquences optimales d’exploitation dans les gisements très inclinés

    By A. Coulombe

    "RésuméL’analyse des séquences d’exploitation, actuellement en usage pour les gisements très inclinés, a démontré qu’elles ne sont pas toujours optimales du point de vue du contrôle des terrains et de

    Jan 1, 1998

  • CIM
    The Uncertainty Modeling Process

    By Jason Mewis

    Jason Mewis is the founder and president of ENGCOMP, a consulting engineering firm in Saskatoon Saskatchewan focusing on the mining sector. He has over 17 years of experience working on projects for t

    May 1, 2013

  • CIM
    Gold Mining at Caribou, Nova Scotia

    By John Wightman

    LOCATION OF PROPERTY THE property of Caribou Gold Mines, Limited, is situated in the north-eastern part of Halifax county, seven miles south of the Canadian National railway line at Upper Musquodobo

    Jan 1, 1938

  • CIM
    Mathematical modelling of the Sherritt-Gordon ammoniacal pressure leaching process

    By P. A. Bahri, D. G. Dixon, T. M. Woodward

    A comprehensive mathematical model of the Sherritt-Gordon ammoniacal pressure leaching process at K winana Nickel Refinery has been constructed. The process is comprised of six autoclaves functioning

    Jan 1, 2005

  • CIM
    Coupled Hydromechanical Modeling of Rock Mass Response to Hydraulic Fracturing: Outcomes Related to the Enhancement of Fracture Permeability

    By M. Bustin, A. Hosseinian, G. Preisig

    Hydraulic fracturing and hydraulic shearing techniques are essential for the development of unconventional oil & gas and geothermal resources. Such techniques will also play a key role in the developm

    Jan 1, 2015