Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987

  • CIM
    Maximizing Energy Efficiency in Smelter Feed Drying

    By C. -G. Berg, J. T. Tuominen

    Since the beginning of the 20th century, energy efficiency in copper smelting has been improved by a factor of 30 as a result of adopting autogenous smelting processes with more and more efficient was

    Jan 1, 2019

  • CIM
    Recirculation Of Chilean Copper Smelting Dust With High Impurities Contents To The Smelting Process

    By H. Sano

    Most of the dust generated from the copper smelting process in Chile has been stored after the stabilization by hydrometallurgical process because it contains high concentrations of arsenic. However,

    Jan 1, 2007

  • CIM
    The Beneficiation of Barite by Agglomeration

    By I. E. Puddington, F. W. Meadus

    The beneficiation of barite in mill tailings using an agglomeration technique has been demonstrated. Barite was selectively absorbed from a conditioned aqueous slurry into a collector oil by mechanica

    Jan 1, 1973

  • CIM
    The Shatter Cut at the McIntyre-Porcupine Mine

    By A. W. Jacob

    THE shatter cut, or burn cut as it is often called, is one in which the centre of the round is almost reamed out by drilling holes so close together that the blasting of a few holes shatters the rock

    Jan 1, 1942

  • CIM
    Joining Geomechanical and Geophysical Monitoring at Coal and Ore Mines

    By V. V. Zubkov

    The systems of geophysical monitoring have been already put into operation at coal mines and ore mines. Since at present it is rather difficult to conduct mine experiments; it is necessary to start a

    Aug 1, 2013

  • CIM
    Feeding Blast-Furnaces to Save Coke

    By F. E. Lathe

    The method of feeding blast-furnaces to be described below is simply the application of well-known principles, and an attempt to carry that application to its logical conclusion. It does not involve r

    Jan 1, 1925

  • CIM
    Electric Furnace Freboard Combustion CFD Modeling

    By A. Golpaygan

    Application of Computational Fluid Dynamics (CFD) modeling for simulation of fluid flow and combustion in industrial scale electric furnace is presented. Poor combustion efficiency, roof and/or side w

    Jan 1, 2011

  • CIM
    Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case Study

    By Zhiye Zhao, Jianping Sun, Zhipeng Xu

    "The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of

    Jan 1, 2015

  • CIM
    Zero Gravity Dry Environment Mineral Separation

    By A. Taylor

    This paper considers mineral processing in zero gravity dry environments typical of asteroids or comets. The electro-dynamic separation technique using pneumatic flow systems is explored. Pneumatic de

    May 1, 2001

  • CIM
    Energy Calculations for SAG Grinding of a Sulfide Copper Ore

    The most expensive unit operation in the beneficiation of ores is grinding. The correct design of the grinding circuit is crucial to prevent unnecessary use of energy. Proper design and evaluation of

    Jan 1, 2007

  • CIM
    Epigenetic gold deposits and their tectonic setting in the New Brunswick Appalachians

    By A. A. Ruitenberg, S. C. Johnson, L. R. Fyffe

    "Several types of stratiform and epigenetic gold deposits have been found in New Brunswick, It is the purpose of this paper to describe and classify the epigenetic deposits and demonstrate their relat

    Jan 1, 1990

  • CIM
    Silver Standard Mine

    By Alexander Smith

    "The Silver Standard mine is 6 miles by road northwest of New Hazelton, B.C., a small town on the northern line of the Canadian National Railways some l 75 miles northeast of Prince Rupert. The deposi

    Jan 1, 1949

  • CIM
    The Performance of a Lamella Thickener at Inco's Copper Cliff Nickel Refinery

    By B. R. Bowerman, W. J. Thoburn, M. J. Humphris

    "Nickel granules are produced for carbonylation by pouring a molten stream into a path of high pressure water. Granules and water are separated in dewatering bins. The overflow, which contains up to 0

    Jan 1, 1977

  • CIM
    High Cycle Fatigue Behaviour Of Shot-Peened Forged And Crackable MR Cooled Steels

    By M. Mirzazadeh

    Air cooled crackable and conventional forged steel specimens were tested under reversed push-pull conditions to examine the effect of shot-peening on their high cycle fatigue behaviour (-106 cycles).

    Jan 1, 2010

  • CIM
    Automatic Anode Setting at Albras

    By L. S. Almeida, U. A. Courbassier, C. T. Guimãaraes, M. N. Souza, V. L. Silva, H. P. Dias, G. A. Bicalho, B. S. Rocha, P. N. Rodrigues, A. Carnevale

    During primary aluminum production the anode changing is a very important task. So improvements on it will be essential to avoid disturbance and have a better operational control. After anode changing

    Jan 1, 2006

  • CIM
    A Continuum Damage Model to Predict Bit Performance Based on Single Cutter Experiments

    By A. Dahi Taleghani, Amir Shojaei

    A continuum damage mechanics (CDM) based constitutive model has been developed to describe elastic, plastic and damage behavior of rock during drilling. In addition to inelastic deformations, this mod

    Jan 1, 2015

  • CIM
    Investigation of Recrystallization Phenomenon of Single Crystal Superalloys for Gas Turbine Applications

    By D. Seo, P. Au, X. Husang, D. Nagy

    The production of single crystal (SX) turbine blades represents the current stateof- the-art in Ni-based superalloy design. With complex casting processes and alloy composition modifications, SX super

    Jan 1, 2006

  • CIM
    Pacific Nickel Property

    By A. E. Aho

    "The Pacific Nickel property lies 7 miles northwest of Hope and 100 miles east of Vancouver, in the Coast Mountains of southwestern British Columbia. Nickel-copper sulphides were discovered in ultraba

    Jan 1, 1949

  • CIM
    Finite Element Simulation as a Tool for Design and Optimization of Roller Press Performance

    By Richard K. Komarek, Antonios Zavaliangos, Roman T. Dec

    Current industrial compacting and briquetting practices are largely based on trial-and¬error techniques. This paper introduces a two dimensional finite element model of compacting/briquetting process

    Jan 1, 2004