Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Asarco LLC Hayden Converter Retrofit Project – An Update

    By K. Parameswaran, A. Veek, A. Fernandez, P. Safe

    ASARCO LLC (Asarco) Hayden Copper smelter, in Hayden, Arizona, has operated continuously (except for minor labor and economic curtailments) since 1912. The current plant configuration comprises INCO f

    Jan 1, 2019

  • CIM
    Sophisticated Ring Geared Mill Drives Features and Experiences

    By Maarten van de Vijfeijken, Marco Rufli

    "By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve the grinding process. Beside all the direct and indirect advantages, several dedicated

    Jan 1, 2011

  • CIM
    Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation

    By Paul Krivokuca

    Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??

    May 1, 2008

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    An analytical approach to the design of coal pillars

    By K. Barron

    "A computer program is described which will analyze the stability of coal pillars. The extent of the peripheral failed zone and the central elastic core of the pillar, the stress distribution across t

    Jan 1, 1984

  • CIM
    Shovels And Draglines In Western Canada and Factors Affecting Hoist-Rope Service

    By R. G. Hamm

    A brief outline covering the shovels and draglines in use in the open-pit mines of Western Canada, including British Columbia, Alberta and the Yukon, is given, followed by the procedure for the select

    Jan 1, 1979

  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Numerical Expansion Analyses of the Strategic Petroleum Reserve in Bayou Choctaw Salt Dome, USA

    By B. Y. Park

    This paper develops a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert of one of the

    May 1, 2009

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • CIM
    Technology Selection for the Genesee Phase 3 Electricity Generating Station Expansion

    By Les Johnston

    _ BACKGROUND - About EPCOR - Genesee Generating Station - Phase 3 Expansion _ TECHNOLOGY SELECTION - Selection Criteria - Combustion Options - Flue Gas Emission Control Options _ STAKEHOLDER V

    May 1, 2002

  • CIM
    Effluent Treatment Practice at the David Bell Mine

    By A. N. Veltmeyer

    "INTRODUCTIONTeck-Corona Operating Corporation's David Bell Mine is located 35 Km east of Marathon, Ontario. In conjunction with its 1000 tonne per day gold concentrator, the company operates an efflu

    Jan 1, 1989

  • CIM
    Holt-McDermott Milling Operation

    By R. H. Colquhoun

    "INTRODUCTION The Holt-McDermott Mine is wholly-owned gold mining operation of American Barrick Resources Corp. that begun operations in June 1988.The property is located 0.5 km. south of Highway 101

    Jan 1, 1989

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987