Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Flotation Control Based on Froth Textural Characteristics

    By Patrick Pelletier, Pierre-Alexandre Bossé, Julie Fournier, Gianni Bartolacci, Jayson Tessier, Ahmed Bouajila, Carl Duchesne

    "This paper summarizes research into the study of the control of flotation processes based on froth images. The use of numerical image analysis techniques for the extraction of significant patterns (f

    Jan 1, 2005

  • CIM
    Two roles of magnesium in sulphide mineral flotation

    By M. Mirnezami, D. Lascelles, J. A. Finch, E. El-Ammouri

    "In a previous publication, the depressant action of Mg above pH 10 on Cu-activated sphalerite was described (Lascelles et al., 2001). In the present communication, a second role, aggregation is intro

    Jan 1, 2002

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Current Research in Mine Equipment Automation in Australia

    By Michael Hood

    An overview is given of some of the major mining research activities in Australia. Automation of mining equipment is not an objective in its own right. The objective is to improve the safety and the e

    May 1, 2002

  • CIM
    The Brewery Creek Heap Leach Project.

    By Brad Thrall

    "Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m

    Jan 1, 1997

  • CIM
    An undergraduate pilot plant experience

    By L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall

    """Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr

    Jan 1, 1980

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC

    By Ed Beswick

    Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design

    May 1, 2008

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Slurry Dispersion Angle at Choke Outlet in Pressure Letdown with Multi-phase Flows

    By J. Robison, H. Pieterse, C. C. Smith, M. Luque, S. Chipman

    Phase change during pressure let down releases significant amounts of energy that must be controlled to avoid undo wear and tear on equipment. Hydrometallurgical slurries require flow control equipmen

    Jan 1, 2004

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • CIM
    Investigation on the Mechanism of Coal Mine Bumps and Relating Microscopic Experiments

    By Y. X. Zhao

    This paper briefly describes the characteristics and induced factors of coal mining bumps based on the investigation of recent bumps accidents occurred in China. According to the theory of non-equilib

    May 1, 2009

  • CIM
    Distributions of Flow Characteristics and Physicochemical Properties of Acid Mine Drainage in a Settling Pond

    By Dong-kil Lee

    Field tests have been conducted to investigate the characteristics of flow and physical chemistry of acid mine drainage(AMD) in the Hwangji-Yuchang settling pond in south Korea. pH and ferrous concent

    May 1, 2011

  • CIM
    The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)

    By W. Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t

    Jan 1, 2006

  • CIM
    Tailings Disposal Area Development at Inco Sudbury Operations

    By J. P. Van Cruyningen, M. J. Puro

    "A 2400 acre extension to the existing Tailings Area is under development at Inco's Copper Cliff Milling operations.The new area is being developed in stages as production levels dictate thus minimizi

    Jan 1, 1987

  • CIM
    Introduction of China’s Copper Converting Technologies

    By Huilan Yang, Feng He

    This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting

    Jan 1, 2019

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017