Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrochemical Kinetics of Ferric/Ferrous Reduction-Oxidation on Sphalerite

    By F. Rashchi, A. Ghahreman, J. Moghaddam, S. Karimi

    "In this work, the kinetics of ferric-ferrous redox reaction on a passivated sphalerite electrode is studied by the application of chronoamperometry method in 0.5 mol L-1 H2SO4 solution. The electroch

    Jan 1, 2017

  • CIM
    Reeves Macdonald Mine

    By J. T. Fyles, C. G. Hewlett

    "THE REEVES MACDONALD mine is in the Sa Imo-Pend d'Oreille mining area of southeastern British Columbia. It is on the Nelway-Waneta road 4 miles west of the border-crossing point of Nelway. The Reeves

    Jan 1, 1949

  • CIM
    Furnace Explosions with a Focus on Water (93f71d3e-25e3-44f9-aaef-8155aa27c58e)

    By H. J. Oterdoom

    SMS Group (SMSG) has always been concerned about safety aspects of electric smelter plants for the ferro-alloy and non-ferrous industry. The awareness for safety increased significantly over the past

    Jan 1, 2015

  • CIM
    Innovative liner support trials in underground hardrock mines

    By Chri Langille, Dougal McCreath, Samantha Espley

    "In 1993, trials of two innovative applications of liner support involving the replacement of bolts in the ground support system were undertaken at Inco mines. The first trial involved an evaluation o

    Jan 1, 1995

  • CIM
    Pore Pressure Change During the Excavation of Deep Tunnels in the Callovo Oxfordian Claystone

    By G. Armand, A. Noiret, D. Seyedi, J. Morel

    "Clay formations in their natural state exhibit very favorable confining conditions for repository of radioactive waste because they generally have a very low hydraulic conductivity, small molecular d

    Jan 1, 2015

  • CIM
    Monitoring Lining Wear on Submerged Arc Furnaces

    By P. Schmidt, M. Hopf

    Water-cooled parts of submerged arc furnaces are potentially dangerous, especially if molten matte or slag contacts the water. Explosion hazards and metal run-outs generate high costs for production l

    Jan 1, 2015

  • CIM
    Reducing Water Usage in Gold Treatment—What is Possible

    By Erik Spiller

    "Water and cyanide are highly contentious and conflict issues that many gold mining companies encounter worldwide when dealing with local farming communities, industries and cities competing for water

    Jan 1, 2017

  • CIM
    Incremental Process Improvements at the Pogo Mill

    By J. Sliwinski, H. Kikutani, J. Atwood, D. Larimer, J. Pyecha

    "The Pogo mine start-up milling targets of 2005 are vastly different than the targets of today. Improvements have been driven by unintentional design oversight, continual circuit optimization or optim

    Jan 1, 2017

  • CIM
    Adsorption of Gold From Au(III)-Chloride Solutions on Alternative Materials to Activated Carbon Inorganic Materials

    By T. Feldmann, G. P. Demopoulos

    The adsorption of gold complexes on inorganic metal oxides has been mainly discussed in geochemical literature, but it is also of interest to the hydrometallurgical industry. This is so because it cou

    Jan 1, 2015

  • CIM
    Dry Atomization of Nickel Laterite Slag

    By L. C. So, S. Faucher, S. Mostaghel, A. Triwahyuono, D. Sauter, S. -Y. Oh, S. K. Lee, K. Aswin

    "Molten hauling and water granulation are the commonly used slag treatment methods in the production of nickel. Water is present in these processes either to accelerate cooling of the dumped slag or i

    Jan 1, 2017

  • CIM
    Formability and Friction Evaluation of 6000 Aluminum Grades

    By Jamie N. Burdeski, Susan E. Hartfield-Wünsch

    Aluminum sheet use has been steadily increasing in the automotive industry to achieve mass reduction and improve fuel economy. One significant manufacturing challenge for aluminum sheet implementatio

    Jan 1, 2015

  • CIM
    Engineering, Construction and Project Management of Ambatovy Nickel Project

    By Ed McConaghy, P. LaRochelle

    The Ambatovy Nickel Project comprises the development of mine, hydrometallurgical processing facilities and necessary infrastructure in Madagascar, positioning Ambatovy as one of the world’s largest p

    Jan 1, 2015

  • CIM
    Start-Up and Operation of the Aga Mineração Refractory Gold Pressure Oxidation Plant

    By J. Dennett, M. Faris, M. Antonio, M. Collins, N. Tuffrey, R. Ellenwood, V. Reddy

    "In January 2012, AngloGold Ashanti Córrego do Sítio Mineração, with assistance from Sherritt International Corporation, commissioned a new autoclave for pressure oxidation of refractory gold concentr

    Jan 1, 2017

  • CIM
    Determinants for Processing and Industrial Applications of Chalcedonite Depending on its Different Properties

    By D. Saramak, Z. Naziemiec

    "Chalcedonite is an unique rock due to the relatively small area of its occurrence. It also possesses multi-raw-material features therefore it should be given a special protection aiming at its comple

    Jan 1, 2016

  • CIM
    The Effects of Compositional and Structural Characteristics of Scorodite on its Leaching Stability

    By Li Qihou, Li Yuhu, Liu Zhihong, Liu Zhiyong, Yang Xiaofeng

    Scorodite samples were synthesized, in adding or without crystal seed respectively by using Atmospheric Scorodite Process (ASP), Hydrothermal Scorodite Process (HSP), and Improved Atmospheric Scorodit

    Jan 1, 2015

  • CIM
    Quantification and Speciation of Copper, Arsenic, and Iron in Atmospheric Leaching of Enargite and Chalcopyrite in the Presence of AF 5

    By Fazel G. Jahromi, Ahmad Ghahreman

    "Atmospheric leaching of arsenical sulfide concentrates, and especially enargite leaching, is one of the major challenges within the current hydrometallurgy research area. One of the recent processes

    Jan 1, 2017

  • CIM
    Practical Application of the Metalvision Inclusion Detection System.

    By Iain Sommerville, Hugh Mountford, Dawid D. Smith, Claude Dube, Brett Hixson

    JW Aluminum use lean and Six Sigma techniques to continuously improve their target of reliable, repeatable and reproducible (3R) manufacturing. Six Sigma’s second stage gate, known as "Measure" involv

    Jan 1, 2015

  • CIM
    Recovery of Zinc and Copper from a Zinc Concentrate by Atmospheric Direct Leaching Process

    By J. M. R. Carvalho, M. T. A. Reis, M. R. C. Ismael, M. J. N. Correia, S. M. C. Santos, J. M. Carvajal

    A sulphide zinc concentrate (Zn-40%) has been leached in sulphuric and chloride media to optimize the conditions for the recovery of zinc and copper. Previous results showed that extractions of 95% zi

    Jan 1, 2008

  • CIM
    The evolution of mining at the Bullmoose Mine, Tumbler Ridge, B.C.

    By G. W. Davies

    "IntroductionThe development of British Columbia's northeast coal deposits, represents the single biggest industrial undertaking in British Columbia's history.As a result of this development

    Jan 1, 1992

  • CIM
    Practical Treatment Options for Carbonaceous Preg-Robbing Gold Ores

    By J. M. Bowen, P. Wemyss

    "Gold losses to natural carbonaceous matter during cyanide leaching have been investigated for over a century. The variation in the severity of the problem from one ore to another has led to a range o

    Jan 1, 2017