Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    On the History of Geophysical Exploration

    By Hans Lundberg

    Introduction Today, geophysical exploration is recognized as a special science wedged between geology and mining. Universities and technical institutes have special professors teaching geophysics a

    Jan 1, 1948

  • CIM
    Behaviour of Oil Sands Fines-Sand Mixture Tailings

    By A. R. Sorta, D. C. Sego

    ABSTRACT The settling, shear strength, and index properties of oil sands fines-sand mixture tailings (FSMT) for a wide range of solids and fines content are investigated. Results indicate that the liq

    Jan 1, 2013

  • CIM
    Passivation of a Pyrrhotite-Rich Flotation Concentrate for Cyanidation

    By J. -F. Lepage, M. A. Tomlinson, K. K. Murray

    "The Éléonore mine, located in the James Bay region of Northern Quebec, generates a gold bearing flotation concentrate rich in pyrrhotite. Direct leaching of the finely ground concentrate results in h

    Jan 1, 2017

  • CIM
    Structural Equation Modelling of Leaching of Oxidized Copper-Cobalt Ore in a Hydrochloric Acid Solution (d1bb6c1c-b49b-45ef-b105-a03ee63ff41f)

    By M. B. Kime

    "A set of experimental batch leaching tests studied the effect of pH, time, temperature, and stirring speed on the relative Cu, Co, Ni, and Fe leaching yields of an oxidized copper-cobalt ore sample i

    Jan 1, 2017

  • CIM
    An Updated Data Set for SAG Mill Power Model Calibration

    By A. G. Doll

    "This paper expands the SAG mill survey database published by the Author at Procemin 2013. The new database includes 49 published SAG/AG mill surveys and includes mills from all over the world. The pa

    Jan 1, 2016

  • CIM
    Geomathematical Prediction of Sulphur in Coal, New Lingan Mine Area, Sydney Coalfield

    By C. F. Chung, F. P. Agterberg

    "Prediction of a variable sulphur content in Cape Breton seams is important for planning the production of a highgrade metallurgical coal. Two extrapolation methods (Kriging and a version of Universal

    Jan 1, 1973

  • CIM
    A Report on Improvements in Drilling and Blasting Practices at IOC?s Carol Lake Project

    By M. H. Pelley

    To increase drill fleet capacity and meet increased ore demands at its Carol Lake Project, the Iron Ore Company of Canada initiated a program in 1975 to convert the Gardner-Denver 120 and Bucyrus-Erie

    Jan 1, 1978

  • CIM
    A numerical description of the formation of a crater in rock blasting

    A newly developed damage model was used in the study of rock fragmentation mechanisms involved in crater blasting. Simulations show that at the detonation of the explosive charge, a crushed zone aroun

    Jan 1, 1998

  • CIM
    Progress in Coal Mining Technology (96be6499-4406-45a3-aa5f-2bc856cde4c1)

    By A. Ignatieff

    This is the second review of developments in coal mining engineering (see C.I.M .M. Transactions, Vol. LI, 1948, pp. 262- 264) and covers the period from October, 1948, to January, 1950. Mechanizat

    Jan 1, 1950

  • CIM
    The Canadian Precambrian Shield

    By J. E. Gill

    "The name 'Canadian Shield' is used for a vast area; largely in northeastern; Canada; underlain by Precambrian rocks. The part in Canada has an area; of about 1; 790; 000 square miles. Extensions in G

    Jan 1, 1954

  • CIM
    Dynamic-Load Demand on Ground Support Systems

    By P. Morissette

    Passive monitoring of support performance during rockbursts was conducted at three deep underground mines. A comprehensive database was constructed of 172 seismic events and the associated damage to s

    Aug 1, 2013

  • CIM
    Melting Behavior of Solid Feed Charged onto Bottom Stirred Matte Bath

    By K. Krishnapisharody, S. Clark, M. Barati

    Different gas purging methods to metallurgical baths have been applied to date, among which are top lancing and bottom blowing through tuyeres or porous plugs. Among these, the porous plug bottom blow

    Jan 1, 2007

  • CIM
    The value of decelerometer testing

    By Keith Jones, Largo Albert

    "Decelerometer testing of a rigid guide system in a mine shaft pro vides usefuI information to operating and maintenance people. High acceleration/deceleration rates can lead to high maintenance costs

    Jan 1, 1984

  • CIM
    Extending the Life of Brunswick Mine - An Integrated Approach to the Evaluation of the Mining Remnants: Many Opportunities, Many Challenges

    By Pierre Bernard

    Contents of the presentation ? Overview of Brunswick 12 Mine ? Brief description of the mine geology ? Summary of the current Mineral Reserves and Additional Mineral Resources ? Review of the ongo

    Apr 1, 2005

  • CIM
    Pétrographie de la matière organique et assemblages des minéraux des arglles du district minier et de la région de Pine Point, Canada : une caractérisation des anomalies associées aux gîtes

    By André Chagnon, Yvon Héroux

    "Résumé - Cette étude porte sur l'altération de la matière organique et des argiles dans les boues carbonatés dévoniennes du faciès ""F"" de la Formation de Pine Point et ses équivalents stratigr

    Jan 1, 1994

  • CIM
    Carbothermal Upgrading of the Awaso Bauxite Ore using Waste Polypropylene as Reducing Agent

    By F. Awotwe-Appiah, P. Koshy, A. Y. Fosu, J. Dankwah, J. R. Dankwah

    Ghana currently exports its bauxite raw without any value addition. Gradual depletion of high grade bauxite (with high alumina content) and the emergence of low grade bauxite (with high iron oxide con

    Jan 1, 2015

  • CIM
    Prediction of Thermodynamic Properties of Si-P and Si-Fe-P Alloys for Solar Grade Silicon Refining Com 2015 - 54th Annual Conference of Metallurgists Held in Conjunction with AMCAA - America's Conference on Al Alloys

    By A. McLean, W. Q. Chen, W. Yan, M. Barati, Y. D. Yang

    In order to maximally remove the harmful impurities phosphorus and reduce the loss of valuable elements from Si-based alloy for production of solar-grade silicon, thermodynamic properties of the Si-ba

    Jan 1, 2015

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Bourlamaque batholith and its gold potential, Val d'Or, Quebec

    By Mehmet F. Tauer, Pierre Trudel

    "The metamorphosed mineralized Archean Bourlamaque batholith, dated at 2710 +-54 Ma, is a homogeneous body, composed mainly of quartz diorite; it is cut by late dioritic, mafic and aplitic dykes, and

    Jan 1, 1989