Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Frozen Lump Generation of Oil Sands ? Climatic Challenges and Solutions

    By Derek J. Cyr

    Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.

    May 1, 2004

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • CIM
    Corrosive Wear and its Control in Ball Mill Grinding - A Progress Report

    By Dr. G. R. Hoey

    "Abrasive wear and corrosive wear of carbon-steel grinding balls occurred simultaneously during the wet-grinding of hematite iron ore, and Ni-Cu sulphide ore, in laboratory ball mills. Two corrosion c

    Jan 1, 1974

  • CIM
    Unique Ceramec® Filter Technology Has Opened New Doors to Cost-Effective Dewatering

    By Bjarne Ekberg

    "The most economical way of dewatering mineral concentrates is to reduce the moisture content in the material mechanically using thickeners and filtration avoiding thermal drying whenever possible. In

    Jan 1, 2003

  • CIM
    A Reservoir Study of the Pincher Creek Field

    By F. D. Aaring

    "IntroductionTHE PINCHER CREEK gas condensate field, in Township 3, Range 28, and Townships 3 and 4, Range 29, West of the Fourth Meridian, was discovered in 1947 by the Canadian Gulf Oil Company with

    Jan 1, 1952

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    The Role of Flotation in the Recovery of Gold

    By I. Jackman

    "Gold is present in different forms and associations in different ores. Flotation is used to recover gold and minerals associated with gold, but the applicability and type of flotation vary. The purpo

    Jan 1, 1995

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Implications of the Geomechanical Interpretation of the Copper Rand Deposit on the Dore Lake Shear Belt

    By J. Guha, R. Kanwar, G. Archambault, A. Tremblay

    The Copper Rand Cu-Au deposit lies within a shear zone which strikes N50-60W and dips steeply southward (50°-55°) and extends over 1. 5 km with a thickness which varies form 350 to 425 metres. Mineral

    Jan 1, 1984

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    Advances in the Use of Thin, Spray-on Liner Systems

    By James F. Archibald

    In historic mining practice, typical thin liner support systems have been considered to comprise non-reinforced or mesh-reinforced shocrete linings. In the early 1990?s, development of alternate forms

    May 1, 2002

  • CIM
    Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess Mine

    By Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam

    "The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c

    Jan 1, 2007

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Standardization of Data Formats as Basis for Future Efficient Mine Production

    By Christoph Mueller

    Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro

    May 1, 2002

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005