Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    On the Surface Permeability of Indiana Limestone

    By P. A. Selvadurai

    This paper presents the results of a research investigation leading to the development of a technique for the measurement of the surface permeability of Indiana Limestone. The tests are conducted on a

    May 1, 2009

  • CIM
    Mineral Processing Education in the United States

    By Kathleen A. Altman

    "This paper supplements the information provided annually at the Canadian Mineral Processors Operators Conference regarding the education of Mineral Processors in Canada. The purpose of the paper is t

    Jan 1, 2008

  • CIM
    Potash Processing - A Review

    By A. F. Banks

    "The last time I spoke to you the potash industry was at a low point. Markets were bad and the industry depressed. Many people had left and there was very little being done in terms of development. Th

    Jan 1, 1982

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Freeport McMoran El Paso Refinery Steam Control

    By Bradford C. Wesstrom, Ricardo Parra

    The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at

    Jan 1, 2019

  • CIM
    Flotation Performance Improvement at Placer Dome Kanowna Belle Gold Mine

    By S. Schwartz, T. Bilney

    "Over recent years a number of techniques have been developed as part of the AMIRA1 P9 project to represent mathematically or measure directly sub-processes occurring in flotation cells. These include

    Jan 1, 2005

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    A Simple Method to Estimate Tensile Strength and Hoek-Brown Strength Parameter mi of Brittle Rocks

    By M. Cai

    A practical simple method is proposed to estimate the tensile strength (st) of strong brittle rocks from the strength ratio of R= sc/st = 8 sc/sci, where sc is the uniaxial compressive strength and sc

    May 1, 2009

  • CIM
    The Impact of Grinding Chemistry on Galena Flotation at Rosh Pinah Zinc Corporation, Namibia

    By Marco Lombard, Paulus Kapolo, Christopher J. Greet

    "The conversion of a concentrator from one grinding media type to another is a major undertaking in terms of both financial and technical risk. So, a strategy of completing sufficient laboratory and f

    Jan 1, 2013

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Gold Extraction from Refractory Ore by Pressure Oxidation and Thiourea Leach

    By D. M. Wyslouzil

    "Micron or sub-micron size gold inclusions in sulphide minerals cannot be extracted by conventional cyanidation. The gold surfaces must first be exposed by decomposition of the sulphides. As an altern

    Jan 1, 1985

  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • CIM
    Establishing the process mineralogy of gold ores

    By B. Jago

    From the perspective of metallurgical processing, gold ores can be classified into freemilling and refractory ores. Their extractive metallurgy is largely driven by mineralogical factors such as gold

    Jan 1, 2006