Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mining Schools in Relation to the Mining Industry

    EARLY in 1911 the Public Service Board of New South Wales suggested the advisability of inaugurating a School of Mines at Broken Hill, arid made inquiries to determine how such an institution should b

    Jan 1, 1912

  • AUSIMM
    Electroformed Gold from Gold Mine Solutions ù A New Approach to Gold Recovery

    Laboratory and pilot plant investigations aimed at recovering gold as an electroformed sheet from gold eluate and gold leach solutions and slurries are discussed. The electrolytic test work undertaken

    Jan 1, 2007

  • AUSIMM
    Further Notes on Underground Mine Fire Prevention at the South Mine, Broken Hill

    CONTENTS.IntroductionAcknowledgementsDescription of MineVentilation of MineOrganisation of Fire Fighting SquadsTraining of Fire Fighting SquadsRescue WorkFire Fighting and Rescue EquipmentFire AlarmsC

    Jan 1, 1946

  • AUSIMM
    Considerations for Effective Gold Process Development

    By A Giblett, R Dunne, D Appelhans

    There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be

    Jul 15, 2013

  • AUSIMM
    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Sep 13, 2010

  • AUSIMM
    The Useful Minerals of Tasmania

    The distribution or the userul minerals or Tasmania is so closely connected with the geological structure of the island that it will be convenient to briefly recapitulate the principal ract or its geo

  • AUSIMM
    Timing and Geodynamic Setting of the Late Palaeozoic Polymetallic Mineralisation in Chinese North-western Tianshan – Insights from Geochronology and Petrogenesis of Granitoids

    By L-B Fu and J Tan, J H. Wei, N Tian

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kendenggaoer-Kuokuqueke region lies in the western part of Chinese North-western Tiansh

    Mar 18, 2015

  • AUSIMM
    Geochemical Ore Guides and Techniques in Exploration for Tin (f197bab6-bf99-45ab-8d21-404dd026e852)

    Geochemical data on Australian granites and pegmatites, and the mineral components of these rocks, are compared with that obtained in similar studies in the U.S.S.R. and elsewhere.The geochemical char

    Jan 1, 1963

  • AUSIMM
    Aspects of Mining at Ok Tedi

    By Zwaan J, Kepa J

    Ok Tedi mine has become one of the major copper producers in the world. In the process of becoming of age, it overcame the challenges of operating in a locality which is young in geological terms,

    Jan 1, 1991

  • AUSIMM
    Methods of Restoring New Zealand Native Forests after Mining

    By C Ross

    This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe me

    Jan 1, 1995

  • AUSIMM
    The Reduction of Nickeliferous Laterites: Thermodynamic Considerations

    By Turnbull A. G

    Thermodynamic calculations based on the ideal system NiO - Fe203 - H2(g) - CO(g) - H2O(g) - CO2(g) show that it is not possible to selectively reduce nickel oxide in the presence of hematite because f

    Jan 1, 1980

  • AUSIMM
    Solutions to Acid Mine Drainage at Blackball and Sullivan Mines

    By K Gordon

    A methodology for assessment and remediation of acid mine drainage (AMD) developed at the Sullivan Mine in the West Coast Region has been applied to the closed Blackball Mine, Blackball, West Coast Re

    Jan 1, 2004

  • AUSIMM
    Evaluation of Gippsland Basin Onshore Structures for Compressed Air Energy Storage

    By Wilson D, Kirkland J

    Compressed air energy storage (CAES) uses low cost off-peak energy to compress air and pump it into pressurised underground storage. Expanding the air through a modified form of gas turbine generate

    Jan 1, 1992

  • AUSIMM
    Investigation of Pressure Drop in Packed Beds with Melting

    Pressure drops were measured in a column packed with glass spheres and wax particles, both in random and preferential distributions. Variables investigated included wax content, gas flow rates, and te

    Jan 1, 1970

  • AUSIMM
    Processing Strategies for Hidden Valley Operations

    By J Watt

    The Hidden Valley Gold Project is located in a remote and mountainous area of the Morobe Province approximately 30 km south of the township of Bulolo and approximately 90 km south-southwest of the pro

    Jan 1, 2009

  • AUSIMM
    The Geology of Mount Morgan

    CONTENTS:1. Introduct'iona. Previous Accountsb. Summary of Geologyc. Physiography2. Morgan Groupa. Lithologyb. Structurec. Faulting3. The Mineral Deposita. Descriptioni. Size and Shapeii. Composi

    Jan 1, 1952

  • AUSIMM
    On-line Measurement of Magnetic Susceptibility for Titanium Minerals Processing (07ecfeb8-974f-4465-9d0b-cf00ad6e74cf)

    By P N. Holtham

    Magnetic separation is routinely used in the processing of titaniumminerals, and the efficiency of these operations can be determined bymeasuring the magnetic properties of the process streams. The va

    Jan 1, 2001

  • AUSIMM
    Fragmentation Characteristics of Iron Ores from Anshan, China

    Fragmentation Characteristics of Iron Ores from Anshan, China

    Sep 13, 2010

  • AUSIMM
    The Occurrence of Gold in the Broken Hill Lode

    The smelting of the Broken Hill lead concentrates at the Broken Hill Asso,ciated Smelters produced, among other products, approximately 4,900 ounces of gold and 8,800,000 ounces of silver during the y

    Jan 1, 1940

  • AUSIMM
    Avoid Average Design in Processing Plants

    The quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st

    Jan 1, 2004