Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Tailings regulation – a South Australian perspectiveBy G B. Smith, G M. Marshall, A Querzoli
The South Australian mining regulatory framework has adopted a performance based approach to the management of risk. This approach has been in place in South Australia for more than 10 years and is in
Jul 23, 2018
-
Project-Finance Risks ù Due Diligence MattersProject-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/
Jan 1, 2007
-
Logistics in Mining Towards 2000 'The Low Cost Provider'A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa
Jan 1, 1996
-
The Decision of Stationarity in Modern Resource EstimationBy B J. Wilde
Evaluating the resources and reserves in a mineral deposit requires many interdependent subjective decisions. The decision of stationarity is arguably the most important. This decision includes: the
Sep 26, 2011
-
Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter StudyBy L Smith, R Beckie
An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w
Jan 1, 2003
-
Treatment and Utilisation of Hilton Mine WaterBy Teague JWS, Jung RF, Kadletz O, Jones DR, Jones CJ
A study of the passive treatment system for Hilton minewater revealed that it consists of four main process steps. The water, which contains soluble and particulate iron and zinc and is supersaturat
Jan 1, 1988
-
Cunning Solutions to Process ImprovementBy T J. Napier-Munn
This paper proceeds from the premise that process improvement is a key part of the mineral engineer’s role, and one in which he/she can make a significant contribution to shareholder value. It present
Sep 1, 2014
-
Some Metallurgical Aspects of the Kidston Gold MineBy Plyley WF
Kidston Gold Mine is a 3.5 million tonnes per year operation located 280 kilometres west of Townsville, Queensland. Kidston's ore body consists of 44.3 million tonnes graded at 1.79 grams per ton
Jan 1, 1986
-
Behaviour of Phosphorus and Sulphur in Slag Melts During CaO DissolutionBy Yanagase T, Nakamura T, Ueda Y
The possibility of removing the phos phorus and sulphur contained in steelmaking slag has been studied by observing directly through the microscope melts heated on Pt- filaments. After a CaO crystal
Jan 1, 1980
-
The impact of rip lines on erosion at the Ranger Mine SiteBy M J. Saynor, J B. C Lowry
The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19
Jul 25, 2018
-
The Design of Coal Preparation Plants for Australian CoalBy Pell D
Mechanical cleaning of coal was porforined in a few small plants in New South Wales from 1577 brit the first large coal washeries were built by Broken Hill Wbprietary Company Limited and Australian
Jan 1, 1969
-
Geochemical and Mineralogical Characterisation of Two Contrasting Waste Rock Dumps ùThe INAP Waste Rock Dump Characterisation ProjectBy P Fines, D J. Williams, G W, S Miller
This paper presents the results and findings of geochemical and mineralogical testwork conducted on samples collected from waste rock dumps at two mine sites, located in South Carolina, USA (Site 1) a
Jan 1, 2003
-
Elrington CollieryBy Hindmarsh G
The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea
Jan 1, 1935
-
Innovative Investigation Techniques used for Geotechnical Modelling of the Northside Storage Tunnel Project, SydneyBy B Whiteley, B Gee
The Northside Storage Tunnel is a TBM driven rock tunnel system designed to collect and store sewage from four major storm overflow points along the existing Northern Suburbs Ocean Outfall Sewer. At p
Jan 1, 1999
-
A Study on the Separation of Fine Cassiterite and Quartz by Liquid-Liquid ExtractionBy Wakamatsu DT, Nakahiro Y
This present paper deals with the fundamental study of the separation of fine cassiterite and quartz by liquid-liquid extraction using iso-octane as an oil phase, dodecylamine acetate (DAA) as a col
Jan 1, 1993
-
The Introduction and Application of Carbon-in-Pulp in a Heap Leach ProjectBy Mann LD
The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro
Jan 1, 1982
-
Recent Developments at Olympic DamThe Olympic Dam deposit is located some 600 km north of Adelaide in South Australia. It was discovered in 1975 by Western Mining Corporation and in 1979 a joint venture was formed with British Petr
Jan 1, 1996
-
The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/
Jan 1, 1984
-
High P:Metamorphism and its Relation to Deformation in the North D'Aguilar Block, SE Queensland, AustraliaBy Holcombe R. J, Dobos S. K, Little T. R
Blue amphibole-bearing rocks in the North D'aguilar Block of southeast Queensland occur either as relict pods and lenses within regionally extensive greenschist facies phyllites and schists or as
Jan 1, 1990
-
Evaluation of the Effects of Organic Matter on the Net Acid Generation (NAG) TestBy S Miller, R Smart, J Thomas
Single-addition and sequential net acid generation (NAG) experiments were carried out on natural and prepared samples with varying contents of organic matter and pyritic S. Results show that carbonace
Jan 1, 2003