The importance of the curing stage in the fixation of arsenic in pressure oxidationBy M Chen, W S. Ng, Y Liu
In the processing of refractory gold-bearing sulfides, pressure oxidation (POX) is commonly known for its role in liberating the gold in solid-solution via oxidation of the sulfide occlusions. For dep
Aug 24, 2022
-
Transforming the Rope Haulage Concept into the 21st CenturyBy B R. Castley
Consumable materials used in mines are often transported to the working areas down shallow angle decline shafts, typically at anywhere between 10¦ and 30¦ to the horizontal. The winding equipment is u
Jan 1, 2005
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
Rehabilitation at Strongman Mine, West Coast, New ZealandCoal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co
Jan 1, 2006
-
Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, VictoriaBy D J. Clark, R F. Wright, M D. Goodz
The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8
Jan 1, 2009
-
Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)By Wang J, Ma Y, Jia H
The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t
Jan 1, 1998
-
Evaluating the Inclusion of the Implementation Variability into Fragmentation ModellingBy H Parra, D Zenteno
Fragmentation modelling has been in use in the mining industry for a long time; however, there are still some aspects to tackle with regard to its use for strategic/planning and day-to-day purposes.On
Aug 24, 2015
-
Mine Life Cycle Planning – Creating Lasting Value for CommunitiesBy S Robertson, I Buitrago
Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in
Jul 16, 2014
-
Phase equilibrium study in the sodium metasilicate primary phase field of PbO-Na2O-SiO2 system between 800 and 1000°CBy X Ling, M Barati, E Moosavi-Khoonsari
In the pyrometallurgical process of secondary lead recycling, a desulfurising agent, such as Na2CO3 is added to minimise the emissions of sulfur into the atmosphere, while silica is introduced into th
Jun 19, 2024
-
Getting the Burden RightBy J Poniewierski, Varcos D
Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap
Jan 1, 1994
-
The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist InstallationThe hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista
Jan 1, 2005
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)By Kuganathan K, Potvin Y
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee
Jan 1, 1998
-
Minimising the Total Cost of Horizontal Development with Burn Cut Blast RoundsThe total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise
Jan 1, 1998
-
Cemented Rock Fill for Extraction of High-Grade Crown Pillars at Crusader Gold MineBy M Dorricott
This paper describes the design, construction and performance of sill pillars using cemented development mullock at the Crusader Gold Mine. The orebody is some 35 m - 60 m in length, 5 m - 8 m wide, d
Jan 1, 2002
-
Upgrading the Gravity Circuit at Marvel LochBy W Newton, J Price
This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of
Jan 1, 2000
-
Putting Geology and Engineering Back into Resource/Reserve DeterminationBy M Darvall And R Fare, D Dormer
The Argo Archaean lode gold deposit is hosted within a structurally complex shear zone system, 70 km south of Kalgoorlie, and 3 km west of the crustal-scale Boulder û Lefroy Fault. Argo is an active u
Jan 1, 2006
-
Microbiology of an Industrial-Scale Chalcocite Heap Bioleaching OperationBy J J. Plumb, P D. Franzmann
A study was conducted to describe the microbiology of the MICCL Monywa chalcocite heap bioleaching operation. Microorganisms were detected in the heap using culture-based techniques and cultureindepen
Jan 1, 2004
-
Address to the 4th Mill OperatorÆs Conference Burnie, 11 March 1991It is indeed a pleasure to be here this morning to open the 4th Mill Operators' Conference. It is no mean feat to organise such an event and I would like to congratulate the committee for the wo
Jan 1, 1991
-
Flotation Separation of Scheelite from Calcite Using Alkylated 8-Hydroxyquinolines as ModifierBy Recepoglu O, Tolun R, Yavasoglu N, Bulutcu AN
Scheelite was floated from a low-grade (0.28 per cent W03) calcitic (96.30 per cent CaCO3) scheelite ore using oleoyl sarcosine as collector and alkylated 8-hydroxyquinoline as modifier. Compared to
Jan 1, 1993
-
A Description of the Treatment of the Copper Impurity in the Lead Ores Smelted at the Sulphide Corporation's Works, Cockle CreekTHE question of dealing with the small quantities of copper found in a great many of the purchased ores became a factor of importance when the Sulphide Corporation decided to refine its own lead bulli