Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
QAQC – proactive Quality Management (QM) supporting reconciliation resultsBy O Dominguez
Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q
Mar 22, 2022
-
Use of drone and LiDAR technology for mapping underground voidsBy D Woolmer
Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and
Mar 15, 2021
-
Development and Implementation of Major Hazard Management PlansBy D Hume
During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards
Jan 1, 2002
-
The role of liberation in physical separation techniquesBy A Gray
Physical separation features in almost every mineral processing circuit. The category encompasses a broad range of techniques and technologies including hydrocyclones, gravity concentration methods (i
Sep 11, 2017
-
Pike River Coal - Hydraulic Mine Design on New Zealand's West CoastPike River Coal Limited is in the process of developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the
Jan 1, 2006
-
Ore Dilution Versus Mine to Mill Optimisation at KCGMBy M Spiteri, S Woth, J Caratti, K Henley
Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic
Jan 1, 2001
-
Controlling Stope Ring Relief in Multi-Level Mass BlastingBy Q Liu
Open stoping is one of the widely adopted methods in underground bulk mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sublevel in the ore zone and blasted
Jan 1, 2005
-
Measuring and Utilising Ore Quality Variability Using Real-time On-belt Elemental Analysis to Improve Mill Feed QualityBy H Kurth
"The focus of this paper is on measuring the composition to improve mill feed quality to minimise the processing of waste, optimise process performance, reduce processing costs and minimise the genera
Oct 10, 2016
-
Reconciliation – Outcomes and ExpectationsBy W J. Shaw
Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin
Aug 18, 2014
-
Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut AlgorithmBy S Chatterjee
The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul
Nov 24, 2014
-
Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous MineBy F Ramos
Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of
Sep 26, 2011
-
The Merlin Zone – Rhenium Quality AssuranceBy D A. Sketchley
The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a
Aug 22, 2011
-
A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy ConceptBy G Turner-Saad
An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics
Sep 5, 2011
-
Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price ConcentratorBy Gomm SA
The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun
Jan 1, 1987
-
Optimisation of copper treatment at Mount Isa Mines LimitedBy Canning RL, Pritchard J
The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes
Jan 1, 1986
-
Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt ReactorBy Floyd J. M
The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover
Jan 1, 1987
-
Process design and commissioning of the Goedehoop coal processing plantBy Swann CA
In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o
Jan 1, 1986
-
Coals to Newcastle the PWCS Ship Unloading SystemThe design and construction of a 2.5 million tonne per annum ship unloading system at the PWCS export coal terminal in Newcastle, NSW, has further increased the flexibility and sophistication of A
Jan 1, 1987
-
The Emperor Epithermal Gold Deposit, Vatukoula, FijiBy Setterfield TN, Jones GFP, Tua P, Davis B, Antonio M
The Emperor gold deposit occurs on the western margin of a 5 Ma caldera in a large, mafic shoshonitic shield volcano on the island of Viti Levu, Fiji. Products from two major pulses of post-calder
Jan 1, 1987
-
Example of a Dynamic Flotation FrameworkFroth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive
Jan 1, 2005