Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western Australia

    By D R. Anstey

    The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land

    Jan 1, 2009

  • AUSIMM
    A Spatially Enabling Relational Geologic Database of Java Island,Western Sunda Arc of Indonesia ù A Step to the Geoscience and Mining Data Model

    By K Watanabe

    A relational database in which its complex contents can be navigated through a map interface (ie spatially enabling) is relatively a new concept yet attractive for geoscience fields. This concept is m

    Jan 1, 2004

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Liberation characteristics of comminuted ore types of the Per Geijer iron-oxide apatite deposits

    By T Seifert, P Krolop, K Niiranen, S Gilbricht

    The Per Geijer iron oxide apatite deposits (IOA) display significant potential mineral resources for Luossavaara-Kiirunavaara AB (publ), known as LKAB. LKAB continuously mines magnetite/hematite ores

    Nov 8, 2021

  • AUSIMM
    Chromite in Beach Sands from Norrie's Head and Stradbroke Island

    By Baker G

    Chromite was recorded among the rare minerals in the natural beach sand concentrates on the coast of Northern New South Wales by Whitworth(l) in 1931, and the commercial production of zircon and rutil

    Jan 1, 1948

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Surrounded by Change - Collective Strategies for Managing the Cumulative Impacts of Multiple Mines

    By D Brereton, C J. Moran

    Intensive resource extraction, in the form of multiple mining operations, presents significant assessment and management challenges for resource developers, governments, community and the environment.

    Jan 1, 2009

  • AUSIMM
    Implementation Strategies for Energy Effectiveness and Sustainability – Example of Anglo American Platinum

    By O Bascur, A Soudek

    Large metallurgical complexes are substantial users of energy, water and assets. To improve the effectiveness of energy and assets the quality of the data and events become paramount for real-time ope

    Sep 1, 2014

  • AUSIMM
    Mineral chemistry of iron oxides in the Leveaniemi iron ore deposit in Northern Sweden

    By A Larsson, K Niiranen

    The Palaeoproterozoic Leveäniemi iron oxide apatite (IOA) deposit of the so-called Kiruna type is currently mined by Luossavaara-Kiirunavaara AB (publ.), commonly known as LKAB. The mineralogy of iron

    Nov 8, 2021

  • AUSIMM
    Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of Availability

    By S P. Young, K R. Monro

    Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa

    Jun 22, 2016

  • AUSIMM
    Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern Cape

    By L A. Balzan, F Nieuwenhuys

    GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi

    Nov 8, 2021

  • AUSIMM
    Modelling of the Ventilation System of a Deep Uranium Mine

    By S C. Bhowmik, R Gupta

    This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The

    Jan 1, 2005

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    Hy3 (Hy-cube) project – Hyundai Steel’s carbon neutral strategy

    By H Kim, M J. Sun

    In order to reduce carbon emissions from the steelmaking process and achieve carbon neutrality, global steel companies are establishing their own medium to long-term strategies and implementation plan

    Jun 19, 2024

  • AUSIMM
    Notes on the Estimation of Tungsten in Ores

    THE following notes simply sum up the writer's experience, which extended over a very busy period of some three years, dealing with wolfram ores and concentrates. The three methods for the estima

    Jan 1, 1922