Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Understanding Ore Characteristics and Equipment Selection

    By K T. Broekman, R L. Koenig

    "The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within

    Aug 12, 2013

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • AUSIMM
    Knelson Continuous Variable Discharge Concentrator: Analysis of Operating Variables

    By I Grewal, B Klein

    The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass

    Jan 1, 2001

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Characterisation of pore pressure in tailings dams and the implications for design

    By D Johns, L Murray

    This paper discusses pore pressures in the embankments of tailings dams by comparing real world data with common design assumptions. Assessment of pore pressures has implications on material behaviour

    Jul 23, 2018

  • AUSIMM
    Working in Metallurgy Research

    When studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.

    Jan 1, 2006

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Phreatic uncertainty in the unsaturated zone of tailings storage facilities: an examination of two Australian case studies

    By E J. Coyle, L A. Millington

    Tailings storage facilities are geotechnically complicated structures that develop heterogeneous strength profiles and varied porewater conditions. The monitoring of porewater pressures is one of the

    Jul 1, 2021

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015