Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Utilisation of Low-Grade Iron Ore Resources to Produce New Product(s) and the Development of the Sishen Expansion Project (SEP), Sishen Iron Ore Mine, South Africa

    By G M. Hoffmann

    Utilisation of lower grade (Jigging technology has progressed to a point where SishenÆs 50 to 60 per cent Fe run of mine (ROM) material, once considered as waste, can be beneficiated to produce a sale

    Jan 1, 2005

  • AUSIMM
    Queensland Mines Plant Trials with Caro's Acid

    By Ring R. J, Waters D. J, Vautier F. E, Fulton E. J

    Laboratory leach tests have been carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's acid (permonosulphuric acid) as an alternative oxidant to pyrolusite

    Jan 1, 1983

  • AUSIMM
    A Review of the In Situ Stress Database for Tunnel Design in the Hawkesbury Sandstone, Sydney, New South Wales

    By G McKay, M Erskine, S Macklin

    The City of Sydney is currently investing in a number of infrastructure projects that require tunnel excavations within the Triassic Hawkesbury Sandstone. It is generally accepted that this formation

    Sep 17, 2014

  • AUSIMM
    The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western Australia

    By T Wellman, G Sternadt, R Hingston

    The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos

    Aug 18, 2014

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Outside Auger Hollow Claw Tipped Mechanical Sampler for Coal

    By Z-Y Pi, B Zhang, S Wen

    "The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i

    Aug 21, 2012

  • AUSIMM
    Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)

    By K Gardner, R Fraval, V Singh

    Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise

    Mar 22, 2022

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining Investment

    By J P. Sykes, C Gemell, A Trench

    The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing

    Jun 22, 2016

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    Methodology development of electrical conductivity measurements for non-ferrous slags

    By L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens

    As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco

    Jun 19, 2024

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Downstream impacts of Grade Engineering and preconcentration

    By J Salaya, J Kwak, L Keeney, S Dehkhoda

    In addition to volatile commodity prices influencing decision making, in recent years, social and environmental performance have become important decision drivers within the mining industry. There are

    Nov 10, 2020

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Metso SmartTag - The Next Generation and Beyond

    By K J. Riihioja, E Nozawa

    SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f

    Sep 26, 2011

  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014