Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Technical Aspects of Reopening Gold Mines in Victoria

    By McCarthy PL

    Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim

    Jan 1, 1982

  • AUSIMM
    Spoil Pile Instability with Reference to the Goonyella Mine, Queensland

    The characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil

    Jan 1, 1981

  • AUSIMM
    Future Trends in the Non-Ferrous Metal Industry of the World

    Between, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The

    Jan 1, 1986

  • AUSIMM
    A Computer Study of Single Track Iron Ore Railway Operation

    By Blair J. R

    A Train Performance Calculator (TPC) is an essential tool in railway operations, as a means of acquiring quickly a precise measure of the performance of the system. Traditionally the TPC was used in

    Jan 1, 1977

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal System

    By Susanto A

    As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the

    Jan 1, 1989

  • AUSIMM
    Selective Grinding to Improve Copper Recovery at Mount Lyell

    By Bisshop J. P W

    Maximum recovery of sulphide minerals by flotation is achieved over a limited size range. Valuable particles above and below this range have a smaller probability of being recovered. In the normal

    Jan 1, 1977

  • AUSIMM
    Successful Mineral Resource Development at the Ernest Henry Copper-Gold Mine, NW Queensland

    By J D. Bryant

    The Ernest Henry Copper-Gold mine, the third largest copper deposit in Australia, is located 35 km NE of Cloncurry in the Mt Isa-Cloncurry mineral district of NW Queensland. Ernest Henry Mining Pty Lt

    Jan 1, 2003

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024

  • AUSIMM
    Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushers

    By H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr

    Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would

    Nov 8, 2021

  • AUSIMM
    Modelling Geometallurgical Variability - A Case Study in Managing Risk

    By S Khosrowshahi, A Weeks, W J. Shaw

    "To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th

    Sep 29, 2013

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Reducing Social Risk and Impact by Engaging Local Communities

    In todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage

    Jan 1, 2007

  • AUSIMM
    The Ballarat East Goldfield - New Insights on an Old Model

    Historical exploration of the Ballarat East goldfield defined two primary quartz vein lode types. Tracking the intersection of these lodes with vertical lines of enrichment (or so-called æindicatorsÆ)

    Jan 1, 2008

  • AUSIMM
    Marketing Australian Bauxite

    Until the early 1960s the world aluminium industry was dominated by six principle pro- ducers with integrated activities from bauxite mining to aluminium production. The growth in consumption of alu

    Jan 1, 1974

  • AUSIMM
    Doubling Production Capacity of the IJmuiden Pellet Plant Between 1970 and 2006

    By M W. I Visser Æt Hooft, R C. Schimmel

    Until recently the Corus IJmuiden pellet plant produced approximately 4.5 Mtpa of pellets. Corus IJmuiden is currently running a program to increase its pig iron production to 6.4 million tonnes HM pe

    Jan 1, 2007

  • AUSIMM
    The Colorimetric Determination of Vanadium in Soils, Sediments, and Rocks for Use in Geochemical Exploration

    Samples weighing 0·5 g are fused with sodium hydrogen sulphate, leached with 5 ml. of 4 M nitric acid and diluted to 10 ml. with water. An aliquot of the clear solution is boiled with concentrate

    Jan 1, 1971

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Sources and Facility of Ignition in Coal Mines

    In a coal mine there are many substances capable of ignition under certain circumstances, which can be placed in the following groups: ordinary combustible solids, dusts, liquids and vapours, gase

    Jan 1, 1981