Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project Management

    By A Radici, S Russell

    The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five

    Jan 1, 2009

  • AUSIMM
    Continuous Haulage Prospects for Underground Coal Mines

    Detailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport

    Jan 1, 1982

  • AUSIMM
    The Permeability of Some Australian Coals

    By Doig ID, Phillips HR

    As a prelude to studying the sorption desorption and permeability behaviour of coal cores in a triaxial stressing rig using sorb- able gases, the air permeability of typical cores was measured. Lump

    Jan 1, 1982

  • AUSIMM
    Solar Salt, Lunar Ambitions

    Solar Salt, Lunar Ambitions I Bauerti The title of this paper is `Solar Salt, Lunar Ambitions'. It is largely the result of a lack of imagination and a tight deadline. I was seeking a catchy ti

    Jan 1, 1995

  • AUSIMM
    Future Trends in the Non-Ferrous Metal Industry of the World

    Between, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The

    Jan 1, 1986

  • AUSIMM
    Modelling Geometallurgical Variability - A Case Study in Managing Risk

    By S Khosrowshahi, A Weeks, W J. Shaw

    "To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th

    Sep 29, 2013

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Technical Aspects of Reopening Gold Mines in Victoria

    By McCarthy PL

    Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim

    Jan 1, 1982

  • AUSIMM
    Spoil Pile Instability with Reference to the Goonyella Mine, Queensland

    The characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil

    Jan 1, 1981

  • AUSIMM
    Reducing Social Risk and Impact by Engaging Local Communities

    In todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage

    Jan 1, 2007

  • AUSIMM
    A Computer Study of Single Track Iron Ore Railway Operation

    By Blair J. R

    A Train Performance Calculator (TPC) is an essential tool in railway operations, as a means of acquiring quickly a precise measure of the performance of the system. Traditionally the TPC was used in

    Jan 1, 1977

  • AUSIMM
    Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal System

    By Susanto A

    As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the

    Jan 1, 1989

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Synergistic Collaboration of Humans and Automated Systems – Innovative Steps Towards Fully Autonomous and Continuous Mining Systems

    By E Widzyk-Capehart, P Vallejos, R Asenjo, J Ruiz-del-Solar

    Throughout the minerals industry, it is evident that a new wave of technological innovation is needed as the mining sector looks for ways to achieve higher security and safety as well as higher produc

    Nov 4, 2015

  • AUSIMM
    Selective Grinding to Improve Copper Recovery at Mount Lyell

    By Bisshop J. P W

    Maximum recovery of sulphide minerals by flotation is achieved over a limited size range. Valuable particles above and below this range have a smaller probability of being recovered. In the normal

    Jan 1, 1977

  • AUSIMM
    Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 K

    By G H. Park, Y J. Jun, J H. Park

    The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on

    Jun 19, 2024

  • AUSIMM
    Are Your Megaproject Schedules and Costs Under – or Out of – Control?

    By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson

    "Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu

    Mar 8, 2016

  • AUSIMM
    Successful Mineral Resource Development at the Ernest Henry Copper-Gold Mine, NW Queensland

    By J D. Bryant

    The Ernest Henry Copper-Gold mine, the third largest copper deposit in Australia, is located 35 km NE of Cloncurry in the Mt Isa-Cloncurry mineral district of NW Queensland. Ernest Henry Mining Pty Lt

    Jan 1, 2003

  • AUSIMM
    Spontaneous combustion hazard assessment of McArthur River Mine waste rock

    By P Marianelli, J Theiler, B Beamish, A Spillman

    The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga

    Jul 23, 2018

  • AUSIMM
    A day in the life of a mineworker in 2045

    By G McCullough, J Bassan, d P. Knights, C T. Farrelly

    By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme

    Sep 1, 2024