Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Transfer Function – New Method to Accurately Predict Resonant Frequencies of a Highwall

    By R Osterman

    As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw

    Aug 24, 2015

  • AUSIMM
    Effect of solid particle size on the viscosity of a secondary copper smelting slag

    By A Van den Bulck, K Verbeken, O Vergote, I Bellemans

    Viscosity is one of the most important physicochemical properties during pyrometallurgical operations. In the sub-liquidus regime, an important factor is the presence of suspended solid particles, yet

    Aug 21, 2024

  • AUSIMM
    Hydrogen plasma in extractive metallurgy application

    By M I. Pownceby, M A. Rhamdhani, S Palanisamy, D Fellicia, B Satritama, G A. Brooks, A Ang

    Metal production have long been using carbon sources as both reducing agents and energy sources. Consequently, the global extractive metal sector contributes significantly to greenhouse gas emissions,

    Aug 21, 2024

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed Permeability

    By A M. Nyembwe, A M. Garbers-Craig, R Cromarty

    With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an

    Jul 13, 2015

  • AUSIMM
    Queensland Mines Should Consider Climate Change Impacts for Decommissioning

    By M C. Evans

    "Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require

    Jul 16, 2014

  • AUSIMM
    A global review of productivity and operational performance in sublevel caving mines

    By A D. Campbell

    The sublevel caving (SLC) mining method is becoming more widely adopted as an underground mining method as mines become deeper and target lower grade mineralisation. SLC has been successfully adopted

    Mar 29, 2023

  • AUSIMM
    Updraught Sintering

    By Green A. D M

    The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima

    Jan 1, 1964

  • AUSIMM
    Geology and Definition of the Wattle Dam Coarse Gold Deposit

    The Wattle Dam gold mine, located near Kambalda in the Goldfi elds region of Western Australia has recently progressed to an underground operation and is now believed to be Australia's highest gr

    Aug 1, 2010

  • AUSIMM
    BHP and management standard: a global approach to reducing geochemical risk and minimising closure uncertainties

    By J Heyes, T Cooper, M Stimpfl, R Staines, J P. Pearce

    Acid and Metalliferous Drainage (AMD) is one of the key risks facing the mining industry worldwide. If not properly managed and/or not identified in a timely manner, AMD has the potential to decrease

    Jul 1, 2021

  • AUSIMM
    Risk assessment of iron mineral resources using conditional simulations

    By W Patton

    Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a

    May 24, 2023

  • AUSIMM
    The influence of charge density and solution ionic strength on polymer flocculant performance

    By JOHN G. RAYNER

    An examination was made of the filtration characteristics of a haematite slurry using a range of polyacrylamide based flocculants in solutions containing up to 3 per cent sodium chloride. The polymers

    Jan 1, 1987

  • AUSIMM
    The Frieda River Project – a Novel Approach to Analysing Exploration Drill Core: How Broken is Broken?

    By D La Rosa, D Bennett

    "Exploration drill core provides for a number of standard measurements essential for determining the viability of a new mine or the extension of an existing one. Rock lithology and alteration can be v

    Jun 15, 2016

  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009