Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024

  • AUSIMM
    Lessons Learnt from Mine Explosions

    By H R. Phillips

    During the 1980s and early 1990s, the South African coal industry experienced a series of methane explosions in which well over 200 coal miners lost their lives. In addition, a fire and an explosion i

    Aug 31, 2015

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    The use of Geometallurgy to Estimate Comminution Parameters within Porphyry Copper Deposits

    By G J. Harbort, K Lam, C Sola

    The relationship between the geology of porphyry copper deposits and their processing performance is an area of interest. Being able to predict comminution properties of the ore from physical characte

    Sep 29, 2013

  • AUSIMM
    Reversing the Trend in Open Pit Mining Equipment Output

    By T Trott, M Lewis, G Lumley

    The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere

    Sep 18, 2012

  • AUSIMM
    Artificial Intelligence (AI)-based predicting influence of technological innovation on stock price of iron ore mining companies

    By P Mugebe, M Yahyaei, M S. Kizil, R Low

    This paper seeks to establish an empirical relationship between the impact of mining technological innovation implementation and a company’s market value. The company’s market value is represented by

    Sep 1, 2024

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Can æNovelÆ Ecosystems Offer Suitable Rehabilitation Alternatives for Post-Mined Landscapes?

    By P Audet, D R. Mulligan, D Doley

    This analysis attempts to reconcile existing ecological theories, rehabilitation planning goals and implementation constraints in the form of a rehabilitation paradigm that considers potential and pra

    Jul 10, 2012

  • AUSIMM
    Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific Conditions

    By J Pearce, M Barteaux, S Pearce

    The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the

    Jul 27, 2015

  • AUSIMM
    The Intec Copper Process: A Detailed Environmental Analysis

    By N J. Welham

    The Intec Copper Process is an environmentally advantageous hydrometallurgical process for the production of high purity copper and associated precious metals from copper sulphide concentrates. The pr

    Jan 1, 2002

  • AUSIMM
    Development of mine intelligent ventilation technology in western China

    By S G. Li

    Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with

    Oct 12, 2022

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • AUSIMM
    Differences between the Engineering Cultures of Australia and Brazil

    By C Fountain

    Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini

    Aug 8, 2011

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Blasting in Reactive Ground

    By N Tyson

    Throughout Australia and the world, there have been in recent years a number of incidents involving the reaction of ammonium nitrate based explosives with ground containing certain types of sulphides.

    Jan 1, 2001