Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
On-Belt Analysis at Sepon Copper OperationBy T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
Implications of the Carbon Price and Developing a Carbon StrategyBy P Holt, M Allen
On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa
Nov 20, 2012
-
Rock Strength Anisotropy and Its Importance in Underground Geotechnical DesignBy M Sandy, A Vakili, J Albrecht
Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati
Nov 5, 2014
-
Predicting Variations in Mill FeedBy P McCarthy
The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction
Aug 8, 2011
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011
-
Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysisBy H Kurth
Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine
Mar 22, 2022
-
Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western AustraliaBy M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion riskBy B Waldon, M Valastro
A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex
Apr 16, 2024
-
Immortality design of the allflux® upstream classifier in the iron ore industry – for a safe workplace and an economic, sustainable and highly efficient separation technologyBy M Steinberg, M Amarant
Upstream Classifier are well-known in the iron ore industry for at least 15 years. At present, more than 60 units are in operation in Western Australia. The advantage of this technology is their capab
Sep 18, 2023
-
Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground MineBy L Sandery, S Light
Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w
Mar 24, 2014
-
The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New ZealandBy R Cooksey
The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou
Aug 22, 2011
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Influence of Cognitive Biases on Project EvaluationBy S Love, M Anderson, M Boland
"The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co
Mar 8, 2016
-
IsaMill™ Design Improvements and Operational Performance at Anglo PlatinumBy C Rule
In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan
Aug 8, 2011
-
Improving Rehabilitation Outcomes using BiocrustsBy S Doudle
The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces
Oct 5, 2011
-
Blast Design Using Measurement While Drilling ParametersBy M Higgins
Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio
Jan 1, 2001
-
Airborne contaminant monitoring strategy and technologyBy J H. J Holtzhausen
Never has there been more focus on the health, safety, and well-being of our employees at the workplace. Ever evolving expectations of individuals, companies and clients are shaping regulatory reviews
Oct 12, 2022
-
Department of Conservation Policies on West Coast Mining and Heritage ConservationNo paper available.
Jan 1, 1996
-
A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South AfricaBy D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam
Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero
Sep 29, 2013
-
Social Licence to Close?By J A. Braithwaite
Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib
Jun 28, 2016