Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    The VALMIN Code and Tenure Compliance – Not Just a List

    By J Evans-Wheeler

    "The mandate of the 2005 VALMIN Code to provide ‘(all) reliable, thorough, understandable material information required by investors and their advisers when making investment decisions’ requires that

    Mar 8, 2016

  • AUSIMM
    Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, Tasmania

    The purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes

    Jan 1, 1949

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational Furnaces

    By A Sadri, S Smith

    In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using

    Jan 1, 2006

  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mine

    By A Nugraha, H Thanasekaran, K Tatetdagat

    The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa

    Aug 29, 2018

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • AUSIMM
    Automatic search strategy for ROM stockpile recovery optimisation

    By M Wagner, H Assimi, F Neumann, C Garcia, B Koch

    Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the

    Nov 10, 2020

  • AUSIMM
    Successfully Implementing Technology-driven Change in the Mining Environment

    By B McCarthy

    Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of

    Jun 22, 2016

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Journey to the Edge of the Basin - Stratigraphic Setting and Iron Mineralisation at the Davidson Creek and Robertson Range Projects, Hamersley Province,Western Australia

    By R McCarthy, P Hawke

    FerrAus Ltd's Robertson Range and Davidson Creek Projects are located in the Hamersley Province about 100 km east of Newman, Western Australia. Significant iron mineralisation defined by an aggre

    Jan 1, 2009

  • AUSIMM
    Routes to Stainless Steel With Improved Energy Efficiencies

    By S Jahanshahi

    In an earlier LCA study, the authors showed that the electricity consumption of the electric furnaces used in the production of the ferronickel and ferrochrome feedstocks made significant contribution

    Jan 1, 2004

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010