Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • AUSIMM
    The Value Opportunity for New Zealand's Lignite Deposits

    The lignites of Otago and Southland offer a potentially viable future feedstock for electricity production and possible conversion to petrochemicals or liquid fuels. The deposits, when combined, repre

    Jan 1, 2005

  • AUSIMM
    Structural analysis and modelling in an evolving mineral resources operation

    By N Arrys, A Jani, S Shahin

    Optimising pit slope stability and reducing strip ratio of a mining operation are two key tasks in geotechnical engineering. With a growing demand for minerals and an increasing cost associated with e

    Sep 1, 2024

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Strong Acid Leaching and Filtration of Lead/Silver Residue

    By Adams R. W

    A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February

    Jan 1, 1989

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training

    By P Oikkonen

    Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and

    Mar 29, 2023

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
    Application of Different Drive Systems for Horizontal Mills

    By M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz

    Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee

    Jul 13, 2015

  • AUSIMM
    Stope Blast Vibration Analysis at Dugald River Underground Mine

    By J Player, R de Vries, E Villaescusa, R Hassell

    Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va

    Aug 24, 2015

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    A Geometallurgical Approach for Iron Ore Product Evaluation

    By B J. Beven, A Vatandoost, J Young, S Campbell-Hardwick

    The intrinsic value of iron ore depends on its physical and chemical characteristics. For example, silica and alumina are unwanted elements, downgrading iron grade and adversely affecting high tempera

    Sep 29, 2013

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industry

    By M Haest, O Dominguez, D Mittrup

    Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn

    May 9, 2017