Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Energy Equation-CoalThis paper covers only the energy uses of natural resources and does not deal with non- energy uses, which in 1975 were of the order of 10 per cent of the total consumption of energy resources. The
Jan 1, 1978
-
Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st CenturyBy W Roy
When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation
Jan 1, 2006
-
Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?By J Hudson
Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici
Jan 1, 2006
-
Productive Partnership – Controlling Vibration and Maintaining Critical Electricity SupplyBy M Nagarajan
Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an
Nov 8, 2011
-
Geometallurgical Modelling and Ore Tracking at Kittilä MineBy M Wortley, J Korteniemi, D La Rosa, L Rajavuori
Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno
Nov 24, 2014
-
A Non-Parametric Bayesian Framework for Automatic Block EstimationBy A Melkumyan, F Ramos
This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of
Sep 26, 2011
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Improving crusher throughput using a problematic ore index based on simple, first principles geologyBy T Walton, C Perring, M Pepper, G Gerber
The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st
Mar 22, 2022
-
Factors Influencing the Choice of Cooling and Refrigeration Systems for MinesBy R W. Wilson, A R. Branch
For hot mines, the use of mechanical refrigeration machines has become an essential feature of ventilation and cooling systems. Over the last 30 years, considerable effort has been made in developing
Jan 1, 2005
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Fusion of molten phase R&D into the metallurgical industry to drive circularityBy S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows
The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability
Aug 21, 2024
-
Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumptionBy A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins
Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy
Sep 1, 2024
-
Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planningBy M Akop, G Phillips, L Elliott
An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo
Mar 22, 2022
-
Viscosity measurement of FeO-SiO2 based slags under controlled oxygen partial pressuresBy S-C Shim, H-R Lee, Y Kang, H Shin
Since iron oxide and silicon oxide are major gangue components in various types of ore, FeO-SiO2 base slag, ie fayalite slag, has been often encountered in pyrometallurgical processes of non-ferrous m
Jun 19, 2024
-
Longwall face floor failure assessment using a semi quantitative risk rating methodologyBy S Grimsey, E Janetzki, J Emery
Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob
Nov 29, 2022
-
Reducing Mining and Mineral Processing Plant Fatality RatesBy N Cann
In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali
Aug 8, 2011
-
Origin of Witwatersrand Gold - A Viable Source Region and Source Process for GoldBy G N. Phillips
No new goldfields have been found in the Witwatersrand Basin for over 60 years, and one consequence of this is a long-term decline in gold production. Exploration throughout this period has been based
Sep 26, 2013
-
Improving tungsten recovery through the reuse of mine wastewaterBy Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen
Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the
Aug 24, 2022
-
Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case StudyBy R Carreau
The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately
Jan 1, 2003
-
Savage River Mines The World's First Long Distance Iron Ore Slurry PipelineBy Davis RA, Wasp EJ, Cowper NT
The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed
Jan 1, 1969