Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Resource Estimation Practice at The Granites Gold Mine, Northern Territory

    The development of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves is a significan step towards informing the financial community and the public about the futur

    Jan 1, 1990

  • AUSIMM
    Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slags

    By J Nell, J Petersen, X C. Goso

    The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation

    Jun 19, 2024

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012

  • AUSIMM
    Tailings governance

    By T Alexieva

    Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana

    Jul 23, 2018

  • AUSIMM
    Leading safely doesn’t only mean leading safety

    By A G. Guinea

    Every person in an organisation has what could be called ‘a different take’ on what it means to be a safety leader. The directors will tell you they are ultimately responsible for everyone’s safety an

    May 5, 2022

  • AUSIMM
    Third World Mineral Development Strategies for Twenty First Century

    By Adusumilli M. S, Subrahmanyam T. V, Rao V. D

    Chance find of an economically important mineral on the sur- face and its exploitation without proper exploration work, has become the habit of humanity since the Bronze Age. The explora- tion and ex

    Jan 1, 1988

  • AUSIMM
    Probability Analysis of Rock and Soil Slopes in a Complex Geology Environment

    In the stability assessment of open pit walls, geotechnical engineers have to deal with uncertainty related to structural geology, rock mechanical parameters, groundwater and so on. This uncertainty

    Jan 1, 1997

  • AUSIMM
    Towards Achieving Sustainable Water Management for an Acidic Open Cut Pit at Mount Morgan, Queensland

    By T Laurencont, C Unger

    The Mount Morgan minesite, located approximately 40 km SW of Rockhampton in Central Queensland, comprises 270 ha of unrehabilitated land which is the currently the major source of acid mine drainage r

    Jan 1, 2003

  • AUSIMM
    Social Responsibility and Obligations to Indigenous Populations

    By Taylor MN

    The influx of an industrial environment into or adjacent to the indigenous society has in the past frequently caused the breakdown of traditional be- haviour and culture, and the generation of socia

    Jan 1, 1978

  • AUSIMM
    The Role of Geologists in Assessing and Quantifying Geological Uncertainty in the Conversion of Mineral Resources to Ore Reserves

    Standards in the public reporting of resources and reserves in Australia have dramatically improved since the implementation of the Australasian Code for Reporting of Mineral Resources and Ore Reserve

    Jan 1, 2003

  • AUSIMM
    Effect of Pre-oxidation and Filtration on Cyanidation of Contaminated Gold from a Flotation Concentrate (677149c7-49e9-4819-8439-028f9085926e)

    By Sparrow GJ, Woodcock JT

    A sample of pyrrhotite flotation concentrate pulp assaying 15.3 g/t An, which had been prepared from an old tailing dump, was treated to extract the gold. Examination of the concentrate with an SEM sh

    Jan 1, 1990

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Fire Suppression Systems – Protection for People, Concrete or Profits

    By A Dix

    Fire suppression systems are but one of the many technologies currently available to manage operational tunnel risks. However, the actual reasons for their use are often shrouded in mischievous discus

    Mar 8, 2011

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Review of Australian Longwall Panel Ventilation Practices

    By S Gillies, H W. Wu

    A study has been undertaken into mine ventilation systems currently in use within Australian modern coal longwall (LW) extraction mines. It reviews systems and discusses evolving changes being adopted

    Jul 1, 2013

  • AUSIMM
    Costerfield – a Narrow Vein Case Study

    By M McCarthy

    Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n

    Jun 22, 2016

  • AUSIMM
    Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central Queensland

    By T Laurencont

    The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham

    Jan 1, 2003

  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • AUSIMM
    Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, Australia

    By Read T. A

    THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to

    Jan 1, 1921