Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off Volumes

    By A Woodley, N C. Kunz

    A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate

    Nov 26, 2013

  • AUSIMM
    Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May Operation

    By S H. Algie, D P. Taplin, S G. Doig

    "Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno

    Oct 10, 2016

  • AUSIMM
    Pacific Rim of Australia: The 600 Million Year Partnership of Gondwanaland and the Ocean

    The eastern third of Australia contains an unrivalled Phanerozoic rock record generated by the regional interaction of Gondwanaland with the Pacific and by the global effect of the 400 m.y. Pangaea -

    Jan 1, 1990

  • AUSIMM
    Palaeogeographic Evolution of Australia with Particular Reference to the Formation of Coal Bearing Sequences

    Having provided basic data in the main paper I would now like to move on to discuss these areas in broader terms and to examine the various coalfields in terms of their tectonic setting and depositio

    Jan 1, 1975

  • AUSIMM
    Stope-Survey Practice at Mount Lyell

    By Coulter L. J

    THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved

    Jan 1, 1915

  • AUSIMM
    Theoretical and Practical Influences on Blast Furnace Aerodynamics by the Bell-Less Top

    After a short theoretical comparison of various typical large bell tops with the bell-less top for segregation and other ,ffects on the material flowing through the equipment proper, a comparative an

    Jan 1, 1975

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Geostatistical Ore Reserve Estimation For The Warrego Mine, Northern Territory

    By Leahey T. A

    The variability of gold mineralization in the Warrego Gold Pod is described by classical statistical techniques using sample distrib- utions and analysis of variance; and by the use of geostatistic

    Jan 1, 1979

  • AUSIMM
    Update on Instantaneous Outbursts of Coal and Gas

    Among countries afflicted with insLantaneous outbursts of coal and gas, Australia is noteworthy because of lesser disturbances of the seams and of the occurrence of CO2 in the seam gas from place to p

    Jan 1, 1993

  • AUSIMM
    The Structural and Tectonic Development of the Frieda River Mineral District, NW Papua New Guinea

    By Hill KC, Foster DA

    Methods for ore reserve estimation are classified. The amount of information needed to asses ore reserves is analysed. Reference is made to gold sampling. Consideration is given to nugget effects a

    Jan 1, 1997

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011

  • AUSIMM
    Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland

    By Hoppe AJ

    Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro

    Jan 1, 1978

  • AUSIMM
    Pilbara Iron Ore Classification - A Proposal for a Common Classification for BIF-Derived Supergene Iron Ore

    A co-operative research project, combining Commonwealth Scientific and Industrial Research Organisation (CSIRO) research scientists findings and company iron ore geologists' expertise, resulted i

    Jan 1, 1984

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Optimizing Exploratory Drill Hole Locations

    By Baafi EY, Chatterjee PK

    The quality of mine planning decisions ultimately depends on reliable estimates of the characteristics of the orebody. The quant- ifiable factors such as grades or thickness can be estimated from f

    Jan 1, 1986

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Indicator Kriging and Other New Geostatistical Tools

    By Baafi EY

    Geostatistics is now widely used in the mining industry in the estimation of ore reserves and terms like kriging, variogram and estimation variance are becoming well known. Ordinary Kriging (OK) ha

    Jan 1, 1987

  • AUSIMM
    Grade Control - A Continuing Exercise in Quality Management

    (Quality can be defined as that which is acceptable to the market and can be supplied with a predictable degree of uniformity and dependability at a low cost. The market for any mining product is down

    Jan 1, 1992

  • AUSIMM
    Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slags

    By J Nell, J Petersen, X C. Goso

    The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation

    Jun 19, 2024

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012