    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    Geology and Nickel Sulphide Mineralization, Honeymoon Well, Western Australia

    By Woodhouse M, Andrews D, Drew G

    The nickel deposits within the Honeymoon Well project area (26¦ 40'S, 120¦ 25'E), located 45 km south of Wiluna, occur in the northern part of the Agnew-Wiluna belt (Figure 1; Hill et at,

    Jan 1, 1996

  • AUSIMM
    Steaming Coal Evaluation by Pilot Combustion Testing

    The Australian Coal Combustion Testing and Research Facility has been operating commercially for one year and during that period coal product evaluations have been conducted on behalf of four coal

    Jan 1, 1987

  • AUSIMM
    Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation Reserve

    By Longworth C. R

    Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio

    Jan 1, 1976

  • AUSIMM
    Vertical Pit Mining - A Novel Alternative to Open Pit or Underground Methods for Mining of Appropriate Massive Shallow Orebodies

    By P J. Terbrugge

    The concept of vertical pit mining has been developed as an alternative mining method for the exploitation from surface of small, vertical or near-vertical, massive orebodies down to depths of some 20

    Jan 1, 2000

  • AUSIMM
    Case Studies Demonstrating Value from Geometallurgy Initiatives

    By A R. Bye

    The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved

    Sep 5, 2011

  • AUSIMM
    Application of Fine Mesh Screens for Dust Suppression in Mine Transport Roadways

    By Todd S, Lam K, Hewitt A

    A series of field experiments investigated the perfonnance of fine mesh curtain screens which were used to suppress coal dust in a transport roadway of a New South Wales colliery. Four types of screen

    Jan 1, 1991

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991

  • AUSIMM
    The Blendevale Carbonate-Hosted Zinc-Lead Deposit, Pillara, Kimberley Region, Western Australia

    By Parrington PJ, Bailey A

    Serious exploration for carbonate-hosted lead/zinc deposits in the Pillara district commenced in 1971 when Trend Exploration acquired exploration tenements covering stream sediment anomalies in th

    Jan 1, 1986

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Flow Behaviour of High Solids Brown Coal-Water Suspensions as Liquid Fuels

    By Christie GB, Mainwaring DE, Leong YK

    High solids brown coal slurries have been prepared with concentrations approaching those achieved with bituminous black coals. The high inherent water content and macroporosity of Victorian brown

    Jan 1, 1987

  • AUSIMM
    The Management of Unstable Slopes, East Open Pit, Daye, China

    By Guo-Zheng J

    This paper describes the risk management strategies adopted to control unstable slopes in the east open pit of the Daye iron ore mine. Extensive experience has been developed over the last 35 years

    Jan 1, 1994

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    Increasing Value in Mining Operations Through the Application of Paste

    By F Palkovitz, S Wilson, F Felipe

    The management of waste from mining operations is a significant aspect of bringing a mineral commodity to final market. The ore beneficiation process and transport/disposal of waste involves significa

    Jan 1, 2009

  • AUSIMM
    The necessary role of the geologist in geotechnical data gathering

    By P B. Hills

    Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t

    Sep 20, 2017

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017