Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Role of Stress Waves and Fracture Mechanics in Fragmentation

    This paper will review some of the work conducted in the past at the Dynamic Effects Laboratory to examine the use of stress waves and fracture mechanics in understanding dynamic fracture and fragment

    Aug 24, 2015

  • AUSIMM
    The Kwademen Gold Deposit: A Polymorphic Mineralization within a Precambrian (Birrimian) Greenstone Belt in Burkina Daso, West Africa: A Case History

    The Kwademen Au deposit was discovered in 1977- 1978 following a regional geochemical survey carried out as part of a UNDP (United Nations Development Programme) and BUMIGEB (Bureau des Mines et de

    Jan 1, 1988

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    R&D roadmaps in mining and water management – a design-led approach to driving sustainability and innovation

    By M Yadav, K Clode, S Daykin

    The mining industry faces numerous challenges related to sustainability and circular economy principles, necessitating strategic approaches to innovation and resource management. As demands for minera

    Sep 1, 2024

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    Surface Assisted Continuous Underground Minign

    Longwall mining has historically been considered an application for only deep reserves. This has changed in the recent past as longwall has become competitive with surface mining. Many resources marke

    Jan 1, 1998

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Development of a Ground Support and Reinforcement Philosophy for Stoping at the Porgera Underground Gold Mine, PNG

    The initially cautious approach taken towards ground support and reinforcement at the Porgera Underground Gold Mine in the Highlands of Papua New Guinea has evolved rapidly in the two years since stop

    Jan 1, 1993

  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    Future Planning Against Mineral Shortages

    As you are all aware, the theme of this con- ference is "International Resources Management". The subject matter of this particular session is "the mineral equation". Looking down the sub- ject matt

    Jan 1, 1978

  • AUSIMM
    ‘It Seemed Like a Good Idea at the Time ...’ Common Mistakes in Geometallurgy

    By P Kittler

    In the spectrum of mining-related disciplines, geometallurgy sits between resource geology and metallurgical engineering. Unlike its neighbours, it is a relatively young discipline and its concepts, p

    Sep 5, 2011

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Application of a reinforcement learning AI solution for optimisation of screening shuttles control

    By A Horeth, E Duggan, B Versiani, A Gooch

    Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati

    Nov 8, 2021

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021